GAA 2025 OO-225OA0021

CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 3, BARANGAY DAMPALIT, MALABON CITY

CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 3, BARANGAY DAMPALIT, MALABON CITY is a DPWH-tracked public work in Malabon-Navotas DEO, National Capital Region. Reported contract value: ₱93,562,293.98. Status: Past target date (DPWH On-Going). Contractor on record: ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST. Figures trace to dpwh.

Malabon-Navotas DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25OA0021 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    75% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Pumping station, cost per station (new construction)

₱93,562,294 per station= 2.4x the National Capital Region median (n=119)

Contract cost ₱93,562,294 ÷ 1 station read from the DPWH title (“PUMPING STATION”; single new pumping station named in title). National percentile: 74. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 3, BARANGAY DAMPALIT, MALABON CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Phase 6, Barangay Tañong to Barangay Dampalit, Malabon City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Malabon-Navotas DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱93,562,293.98

Progress

Past target date (DPWH On-Going)

Start Date

February 20, 2025

Target End

May 5, 2026

5. Audit