Roads20FE0001

OO1:ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS-DANAO-PASACAO RD-K0419+-632-K0419+242

OO1:ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS-DANAO-PASACAO RD-K0419+-632-K0419+242 is a DPWH-tracked public work in Camarines Sur 2nd DEO, Region V. Reported contract value: ₱16,393,330.73. Status: Reported complete (DPWH). Contractor on record: SHLA CONST AND SUPPLY. Figures trace to dpwh.

Camarines Sur 2nd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FE0001 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-11 → 2023-01-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1:ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS-DANAO-PASACAO RD-K0419+-632-K0419+242

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures/Facilities along Libmanan River at Brgy. Sibujo, Libmanan, Camarines Sur
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Camarines Sur 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

83 projects · ₱1.5B total · 0 flags

Other projects by this contractor

No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY (PACKAGE 5), PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT)

Region V, Region V

2022₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), DPWH CAMARINES SUR 2ND DEO, SAN GABRIEL, PAMPLONA, CAMARINES SUR

Camarines Sur 2nd DEO, Region V

2024₱47.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG ROLANDO R. ANDAYA HIGHWAY - K0282 + (-916) - K0282 + (-660), K0282 + (-531) - K0282 + (-458), K0282 + (-406) - K0282 + (-365), K0282 + (-203) - K0282 + (-139), K0282 +

Camarines Sur 1st DEO, Region V

2025₱47.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-VIRAC-BATO-BATALAY-BOTE-BITAOGAN-CARORIAN-CAGRARAY-RADAR STATION ROADS LEADING TO MARIBINA

Region V, Region V

2024₱46.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0415+360-K0415+780, PAMPLONA, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2025₱42.4M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG ROLANDO R. ANDAYA HIGHWAY - K0283 + 000 - K0283 + 109, K0283 + 480 - K0283 + 671, K0284 + 000 - K0284 + 214, K0284 + 493 - K0284 + 787, DEL GALLEGO, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2025₱41.0M
Past target date (DPWH On-Going)
View all 83 projects →

4. Implementation

Contract Amount

₱16,393,330.73

Progress

Reported complete (DPWH)

Start Date

November 24, 2020

Target End

February 1, 2021

5. Audit