Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 6 contracts awarded to LLABAN CONST & SUPPLY FORMERLY: LLABAN CON by the same office started within 57 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 6 in the same municipality. It is common for flood control projects to be split across different rivers and barangays within a municipality for technical or planning reasons.

Public record entityConstruction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato
LocationMAKILALA (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO), Region XIIContract 24MC0053
Amount₱48,755,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato24MC0053100%December 4, 2024November 21, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 20, 2024 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold in one municipality

{
  "deo": "Cotabato 2nd District Engineering Office",
  "contractId": "24MC0053",
  "contractor": "LLABAN CONST & SUPPLY FORMERLY: LLABAN CON",
  "windowDays": 120,
  "clusterSize": 6,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48755000,
  "maxInOneMunicipality": 6
}

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)CotabatoMakilalaSanta Felomina
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault17.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.