High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: LEGACY CONST CORP FORMERLY: LEGACY CONST holds 115 flood-control contracts worth ₱8.29B, 8.18× the 95th-percentile contractor total (₱1.01B); up to 57 ran at the same time. This is a capacity question worth examining. Large contractors may have the resources to handle many projects at once.

Public record entityLEGACY CONST CORP FORMERLY: LEGACY CONSTOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 40Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction (Completion) of River Control Structure and Drainage System, Bangon River Control, Tablas Island, Romblon22E00150Flood control100%June 7, 2023June 7, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction / Rehabilitation of Flood Control Structures along Mangahan River, Brgy Mangahan, Rodriguez, Rizal21DO0049Flood control100%March 1, 2023December 9, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Agbunyog Flood Control along Tablas Circumferential Road (B/S), Sta. 0+271 - Sta. 0+698 (R/S), Sta. 0+470 - Sta. 0+510 (L/S), Sta. 0+525 - Sta. 0+700 (L/S), Sta. Maria, Romblon22EH0032Flood control100%May 7, 2023March 29, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Cabulutan Flood Control, Cabulutan, San Agustin,Romblon21E00076Flood control100%December 22, 2022December 22, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Doña Juana Flood Control Structure along Tablas Circumferential Road, San Agustin, Romblon23EH0085Flood control100%December 12, 2023December 7, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon23E00198Flood control100%March 22, 2024December 10, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Show 34 more projects in this bucket
Construction of Flood Control Structure and Tributaries at Barangay Holy Spirit, Quezon City (Phase 8)23OF0059Flood control100%December 31, 2023December 29, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control Structure at Barangay Commonwealth, Quezon City23OF0061Flood control100%December 31, 2023December 29, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control Structures along Principe River, Brgy.San Vicente Sur, San Vicente Norte and Sta. Rita Sur, Agoo, La Union21AF0030Flood control100%June 27, 2022October 24, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control, Maslabeng Phase I, Buluan, Maguindanao22M00047Flood control100%April 4, 2023April 4, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Mayha - Rizal Flood Control Structure, Tablas Island Romblon23E00197Flood control100%March 22, 2024December 10, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Pili Flood Control Structure (Phase 2), Looc, Romblon22E00057Flood control100%December 31, 2022December 1, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Pili Flood Control, Looc, Romblon21E00076Flood control100%December 22, 2022December 22, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Control along Banica River, Downstream A & B, Valencia, Negros Oriental23HL0031Flood control100%October 8, 2023October 8, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structures along Bicol River, Brgy. Dahilig, Gainza, Camarines Sur23FE0066Flood control100%February 10, 2024October 13, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structures along Bicol River, Brgy. District I, Gainza, Camarines Sur23FE0068Flood control100%February 10, 2024November 24, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structures along Bicol River, Brgy. Malbong, Gainza, Camarines Sur23FE0071Flood control100%February 24, 2024November 21, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Shore Protection, Brgy. Ajong, Sibulan, Negros Oriental22HK0085Flood control100%October 29, 2022October 29, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Tuguis Flood Control Structure (Phase 2) along Looc- Cogon - Tulay Odiongan Road, Brgy. Progreso Este, Odiongan, Romblon22E00136Flood control100%December 26, 2022December 26, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Improvement of Waterway along Bulo River, Sta. 01 + 880 - Sta. 02 + 320 (Left Side), San Miguel, Bulacan22CD0153Flood control100%October 15, 2022October 15, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Canalum River Control, Downstream A, Bayawan City, Negros Oriental22HL0032Flood control100%March 23, 2023March 23, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Canalum River Control, Downstream B, Bayawan City, Negros Oriental22HL0033Flood control100%February 28, 2023February 28, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Canalum River Control, Upstream A, Bayawan City, Negros Oriental22HL0034Flood control100%March 23, 2023March 23, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Canalum River Control, Upstream B, Bayawan City, Negros Oriental22HL0035Flood control100%February 14, 2023February 14, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Manalongon River Control, Upstream A, Sta. Catalina, Negros Oriental22HL0036Flood control100%December 27, 2022December 27, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Manalongon River Control, Upstream B, Sta. Catalina, Negros Oriental22HL0037Flood control100%December 13, 2022December 13, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Palinpinon River Control, Valencia, Negros Oriental22HL0040Flood control100%December 31, 2022November 4, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Tiabanan River Control, Upstream A, Basay, Negros Oriental22HL0043Flood control100%January 23, 2023December 9, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Binalbagan River Bank Slope Protection along Binalbagan-Isabela Road, Brgy. San Jose, Binalbagan, Negros Occidental (Phase 3)23GL0066100%February 14, 2024February 14, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Binalbagan River Bank Slope Protection at Barangay Canmuros, Binalbagan, Negros Occidental24GL0047100%December 4, 2024October 22, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Binalbagan River Bank Slope Protection Upstream of Alicante Bridge along Jct. Bagonawa-La Castellana-Isabela Road, Barangay Bungahin, (Phase IV, Right Bank), Isabela, Negros Occidental23GL0072100%February 11, 2024February 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan Bridge along Bacolod South Road, Brgy. Palayog (Phase IV, Left Bank) Hinigaran, Negros Occidental23GL0062100%December 13, 2023December 13, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Binalbagan River Bank Slope Protection Upstream of Binalbagan Bridge along Bacolod South Road, Brgy. San Jose (Phase IV, Right Bank) Binalbagan, Negros Occidental23GL0076100%December 18, 2023December 18, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Binalbagan Riverbank Slope (Downstream of Binalbagan Bridge) along Bacolod South Road (Right Bank), Negros Occidental22GL0043100%December 13, 2022December 13, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Camansi River Bank Slope Protection Dowstream of Camansi Bridge along Jct Pontevedra - La Castellana Road (Left Bank), Barangay Robles, La Castellana, Negros Occidental23GL0039100%January 4, 2024January 4, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Camansi River Bank Slope Protection Upstream of Camansi Bridge along Jct Pontevedra - La Castellana Road (Left Bank), Barangay Robles, La Castellana, Negros Occidental23GL0037100%December 24, 2023December 24, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Grouted Rip Rap and Line Canal along Bacolod South Road, K0060+550 - K0061+300 and K0064+800 - K0065+250 with exceptions, Binalbagan, Negros Occidental22GL0059100%September 13, 2022September 13, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Grouted Rip Rap and Line Canal along Jct Bagonawa - La Castellana - Isabela Road, K0069+000 - K0070+100 with exceptions, La Castellana, Negros Occidental22GL0060100%September 14, 2022August 15, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Revetment with Floodwall in Mandalagan River, Phase 3, Bacolod City22GO0027100%January 8, 2023January 30, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Su-ay Riverbank Slope Protection (Upstream/left bank of Su-ay Bridge) along Bacolod South Rd. Barangay Su-ay, Himamaylan City, Negros Occidental22GL0041100%November 15, 2022December 12, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "LEGACY CONST CORP FORMERLY: LEGACY CONST",
  "projectCount": 115,
  "totalValuePhp": 8294450719.639998,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name