Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Isabela 1st District Engineering Office awarded 49 of 55 recorded flood-control contracts (89.1%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (18.7 percentage points higher; binomial p = 9.1e-04), across 5 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or careful cost estimation.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Isabela 1st District Engineering Office: contracts
49 of 55 contracts (89.1%) at ≥99.5% of ABC · peer baseline 70.4% · gap +18.7 pts · binomial p = 9.1e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 24BE0097 | Construction of Flood Mitigation Structure along Cagayan River, barangay Arusip, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 24BE0017 | Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 24BE0019 | Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 23BE0042 | Construction of Flood Control Project along Rugo Brook, barangay San Lorenzo, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 24BE0066 | Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 24BE0122 | Construction of Flood Mitigation Structure along Pinacanauan River, Barangay Baculod, Ilagan City, Isabela. | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 23BE0038 | Construction of Flood Control Project along Abuan River, barangay Cabisera 10, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 23BE0006 | Construction of Flood Mitigation Structure along Cagayan River-Phase II, Barangay Bagutari, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 23BE0009 | Construction of Flood Control Project along Ilagan River, barangay Cabisera 7, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 24BE0015 | Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.99% | DPWH |
| 24BE0016 | Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.99% | DPWH |
| 24BE0052 | Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.98% | DPWH |
| 23BE0010 | Construction of Fugu Abajo Flood Control System, Tumauini, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.98% | DPWH |
| 23BE0108 | Construction of Flood Mitigation Structure along Cagayan River, Barangay Mozzozzin Sur, Sta. Maria, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.98% | DPWH |
| 23BE0051 | Construction of Flood Mitigation Structure along Ilagan River, Phase II, Brgy. Camunatan, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.98% | DPWH |
| 23BE0018 | Construction of Flood Mitigation Structure along Cagayan River-Phase III, barangay Uauang Tuliao, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.98% | DPWH |
| 23BE0062 | Construction of Flood Mitigation Structure along Ilagan River, Brgy. Alinguigan 1st, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.98% | DPWH |
| 23BE0050 | Construction of Flood Mitigation Structure along Ilagan River, Brgy. Cabisera 9-11, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.97% | DPWH |
| 23BE0005 | Construction of Flood Control System in Barangay Camasi, Phase II, Tumauini, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.97% | DPWH |
| 23BE0049 | Construction of Flood Mitigation Structure along Cagayan River, Brgy. Naguilian Sur, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.97% | DPWH |
| 23BE0126 | Construction of Flood Mitigation Structure along Ilagan River, Brgy.Cabisera 4, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.96% | DPWH |
| 23BE0035 | Construction of Flood Mitigation Structure along Cagayan River, Barangay Alibagu, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.95% | DPWH |
| 23BE0134 | Construction of Flood Mitigation Structure along Cagayan River, Brgy. Ammugauan, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.95% | DPWH |
| 23B00057 | Construction of Slope Protection Works for Cagayan River Basin, Cagayan River at Sta. Maria, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.95% | DPWH |
| 24BE0069 | Construction of Flood Control Structure, Barangay Tunggui, Tumauini, Isabela | ARVEA'S CONST | 99.95% | DPWH |
| 24BE0076 | Construction of Pasa Small Reservoir IS Slope Protection at Existing Bridge, City Of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.95% | DPWH |
| 22BE0004 | Construction of Flood Mitigation Structure along Cagayan River - Phase II (Sta. 0+280 - Sta. 0+498), Uauang Tuliao, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.94% | DPWH |
| 22BE0008 | Construction of Flood Mitigation Structure along Cagayan River - Phase II (Sta. 0+000 - Sta. 0+215), Uauang Galicia, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.94% | DPWH |
| 22BE0013 | Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+213), Brgy. Capo, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.94% | DPWH |
| 22BE0012 | Construction of Flood Mitigation Structure along Cagayan River - Phase II (Sta. 0+257 - Sta. 0+477), Malapagay, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.94% | DPWH |
| 22BE0007 | Construction of Flood Mitigation Structure along Cagayan River (Sta. 0+000 - Sta. 0+150), Bagutari, Sto. Tomas, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.94% | DPWH |
| 22BE0047 | Construction of Flood Control Project along Cagayan River (Sta. 0+000 - Sta. 0+146), Nagulian Baculod, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.92% | DPWH |
| 23B00009 | Construction of Balug Flood Control at Tumauini, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.91% | DPWH |
| 22BE0054 | Construction of Flood Control Project along Cagayan River (Sta. 0+000 - Sta. 0+050, Sta. 0+241 - Sta. 0+331), Brgy. San Ignacio, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.90% | DPWH |
| 22BE0032 | Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+944), Brgy. Fugu, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.90% | DPWH |
| 24BE0104 | Construction of Drainage Canal, Brgy. District 1, Tumauini, Isabela | ARVEA'S CONST | 99.89% | DPWH |
| 22BE0005 | Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+780, Brgy. Caligayan (Site I), Tumauini, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.89% | DPWH |
| 22BE0057 | Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+950), Brgy. Malalam, City of Ilagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.89% | DPWH |
| 22BE0039 | Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+190), Brgy. Aggasian, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.89% | DPWH |
| 22BE0046 | Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+208), Brgy. Bangag-Manaring, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.89% | DPWH |
| 22BE0025 | Construction of Flood Control Project along Ilagan River (Sta. 0+000 - Sta. 0+229), Brgy. Camunatan, City of Ilagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.89% | DPWH |
| 24BE0125 | Construction of Drainage Canal, Brgy. District 2, Tumauini, Isabela | ARVEA'S CONST | 99.88% | DPWH |
| 23B00036 | Construction of Carpentero-Compania Flood Control Phase II, Tumauini, Isabela | ARVEA'S CONST / EGB CONST CORP FORMERLY: EGB CONST | 99.80% | DPWH |
| 22BE0055 | Construction of River Control at Oway River below the Dicaruyan-Sapinit Bridge, Barangay Dicaruyan, Divilacan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.80% | DPWH |
| 21B00009 | Construction of Flood Control System, Package I, Sta. 0+000 - Sta. 0+296 (Upstream), Balasig, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY / EGB CONST CORP FORMERLY: EGB CONST | 99.68% | DPWH |
| 22BE0018 | Construction of Flood Control Structure with Channelization of Waterway along Aggub- San Juan Creek, Cabagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.66% | DPWH |
| 22BE0017 | Construction of Flood Control Structure with Channelization of Waterway along Balasig- Magassi Creek, Cabagan, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.66% | DPWH |
| 22BE0023 | Construction of Barangay Fugu Sur to Fugu Norte Flood Control System, Phase II, Tumauini, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 99.66% | DPWH |
| 21B00010 | Construction of Flood Control System, Package 2, Sta. 0+296-Sta.0+582 (Upstream), Balasig, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY / EGB CONST CORP FORMERLY: EGB CONST | 99.65% | DPWH |
| 22BE0041 | Construction of Flood Control Project along Cagayan River (Sta. 0+000 - Sta. 0+220) Phase II in Barangay Pilitan, Tumauini, Isabela | ARVEA'S CONST / EGB CONST CORP FORMERLY: EGB CONST | 99.00% | DPWH |
| 22BE0042 | Construction of Flood Control System along Cagayan River (Sta 0+360 - Sta. 0+472), Phase II, Barangay Pilitan, Tumauini, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 99.00% | DPWH |
| 21BE0074 | Construction of Flood Control, Sitio Palattao, Pilig Alto, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 98.50% | DPWH |
| 21BE0073 | Construction of Flood Control, Brgy. Acoba, Luquilu to Casibarag Sur, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 98.50% | DPWH |
| 21BE0057 | Construction of Drainage System at Barangay Ngarag, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 95.00% | DPWH |
| 21BE0056 | Construction of Drainage System, Brgy. Ngarag, Cabagan, Isabela | DRAGON TWELVE BUILDERS & CONST SUPPLY | 95.00% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Isabela 1st District Engineering Office",
"nearAbc": 49,
"trigger": "office_pattern_aggregate",
"officeId": "b3e1c498-a060-55b1-a6df-e4ebfae1563f",
"threshold": 0.995,
"binomialTailP": 0.0009050211279771164,
"nearAbcRatePct": 89.1,
"totalContracts": 55,
"baselineRatePct": 70.4,
"excessPctPoints": 18.7,
"expectedNearAbc": 38.7,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents