Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 19 contracts awarded to ST TIMOTHY CONST CORP by the same office started within 96 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 9 in the same municipality. It is possible that the projects were planned separately for different flood-prone areas in the province.

Public record entityConstruction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra
LocationLA PAZ (ABRA), ABRA, Cordillera Administrative RegionContract 22PA0093
Amount₱46,352,378.91 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra22PA0093Flood control100%December 8, 2022December 8, 2022—completedsumbong source

Start: March 28, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Abra District Engineering Office",
  "contractId": "22PA0093",
  "contractor": "ST TIMOTHY CONST CORP",
  "windowDays": 120,
  "clusterSize": 19,
  "thresholdPhp": 50000000,
  "contractCostPhp": 46352378.91,
  "averageTitleSimilarity": 0.8641703903410409
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program