Cross-Source Mismatch (PhilGEPS vs DPWH)

Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: PhilGEPS award 23MB0008 lists ₱38.76M to ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, ., while DPWH records contract 23MB0008 at ₱42.63M to ACCELERATED METAL TECHNOLOGY & CONST INC. The difference may be due to contract variations, additional works, or adjustments after the initial award.

Public record entityConstruction of Concrete Revetment, (upstream of South Polomolok Bridge), Polomolok, South Cotabato
LocationPOLOMOLOK (SOUTH COTABATO), SOUTH COTABATO, Region XIIContract 23MB0008
Amount₱42,634,628.85 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Concrete Revetment, (upstream of South Polomolok Bridge), Polomolok, South Cotabato23MB0008Flood control100%October 8, 2023October 8, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 18, 2023 · Source fetched October 21, 2026

Rule Definition

Compares linked award and project contractor/cost above tolerance.

Triggering Data & citations

Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record

{
  "linkId": "2b77c513-c692-4f5d-bfe1-67ebb9864daf",
  "awardId": "425e6739-c2af-4c66-9058-2fee0f4d220f",
  "linkScore": 1,
  "nameMismatch": false,
  "amountMismatch": true,
  "awardAmountPhp": 38759846.27,
  "linkValidation": "philgeps_ref equals DPWH contract ID",
  "projectCostPhp": 42634628.85,
  "philgepsAwardee": "ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, ."
}

Possible Innocent Explanations

  • The difference may be due to contract variations, additional works, or adjustments after the initial award.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)South CotabatoPolomolokPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault25.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.