Construction of Concrete Revetment, (upstream of South Polomolok Bridge), Polomolok, South Cotabato
Construction of Concrete Revetment, (upstream of South Polomolok Bridge), Polomolok, South Cotabato is a DPWH-tracked public work in POLOMOLOK (SOUTH COTABATO), SOUTH COTABATO, Region XII. Reported contract value: ₱42,634,628.85. Status: Reported complete (DPWH). Contractor on record: ACCELERATED METAL TECHNOLOGY & CONST INC. Figures trace to sumbong.
Total Contract Cost
