DPWH projects in South Cotabato
2,709 DPWH public works projects are recorded in South Cotabato (Region Xii), with start dates from 2016 to 2025. Recorded contract values total about ₱35,236,200,807.04. 2,606 are recorded at 100% progress and 210 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Concrete Revetment, Downstream of Sinawal Bridge, Sinawal River, Barangay Labangal, General Santos City₱120,624,229.70
- Construction of River Bank Protection, Lusanes, Brgy. Sulit, Polomolok, South Cotabato₱120,624,048.80
- Construction of River Bank Protection Along Ala River, Santo NiñO, South Cotabato₱106,149,850.60
- Construction of Special Care Complex at Dr. Jorge P. Royeca City Hospital, Barangay Lagao, General Santos City, South Cotabato₱99,000,000.00
- Repair/Rehabilitation/Improvement (Asphalt Overlay) Along Digos-Makar Road, K1651+835 - K1654+941, General Santos City, South Cotabato₱97,548,478.68
- Cluster Xii-A.Construction of Riverbank Protection Along Marbel River, Barangay Carpenter Hill, Koronadal City, South Cotabato B.Construction of Riverbank Protection Along Banga River, Barangay Kibid, Norala, South Cotabato C.Construction of Riverbank Pro₱97,380,412.03
- Construction of Multi-Purpose Building, Professional Regulation Commission (Prc) Region Xii-Koronadal City, South Cotabato₱96,500,000.00
- Construction of Concrete Road-Construction of Jct Nhw Poblacion Sto NiñO-Upper Sepaka-Surallah-Lake Sebu Road, South Cotabato₱96,499,985.96
- Construction of Dpwh South Cotabato 1st Deo Building, Tupi, South Cotabato₱96,499,295.00
- Road Widening, Secondary Road - Albert Morrow Blvd - K1661+666 - K1664+932₱96,498,625.43
- Construction of Concrete Revetment Lower Klinan-Mabuhay (Silway River Basin), Sta. 0+000 - Sta. 0+694, Brgy. Mabuhay, General Santos City₱96,498,596.33
- Construction of Concrete Bridge Connecting Makar-Marbel to Brgy. City Heights Road, General Santos City₱96,498,521.87
- Road Widening On Specific Location Along Surallah-Lake Sebu-Maitum Rd (S00294mn) K1733+(-305) to K1737+000, K1737+000 to K1737+501₱96,494,587.09
- Road Widening-Along Marbel-Makar Rd (S00254mn) K1696+(-240) to K1700+218₱96,488,563.88
- Construction of Concrete Revetment, Downstream of Upper Sinawal Bridge, Sinawal River, Barangay Sinawal, General Santos City, South Cotabato₱96,447,860.14
- Construction of Concrete Revetment Along Silway River, Barangay Apopong, General Santos City₱96,400,433.63
- Road Upgrading (Unpaved to Paved) Along Midsayap-Marbel Road, K1773+720-K1774+405 (Chainage 4660 - Chainage 5347), K1796+579 - K1779+802 (Chainage 10492-Chainage 10715); K1780+520-K1781+081 ( Chainage 11430 to Chainage 12059), K1781+094- K1781+238 ( Chain₱96,300,846.90
- Construction of Silway River Boulevard, General Santos City₱95,955,893.05
- Concreting of Jct. Nhw Crossing Repolyo, Barangay Lamcaliaf - Barangay Kinilis Road, Municipality of Polomolok₱95,531,125.23
- Construction/ Upgrading/ Rehabilitation of Drainage Along National Roads - Secondary Roads - Albert Morrow Blvd - K1650 + 521 - K1653 + 055₱94,107,065.90
- Construction of Concrete Road, Jct. Surallah-Lake Sebu-Maitum Road-Luhib-Lamfugon-Tasiman Bypass Road-Sta.4+770.31-8+140, Lake Sebu, South Cotabato₱93,599,721.58
- Channel Excavation With Revetment Along Marbel River (Namnama Section), Sta. 0+000-Sta. 1+285, Koronadal City, South Cotabato₱93,080,654.87
- Asset Preservation-Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Primary Roads - Digos - Makar Rd - K1634 + 250 -K1634 + 488₱92,636,553.11
- Construction of Revetment Along Tinagacan-Buayan River (Phase 3), Brgy. Tinagacan, General Santos City₱91,629,683.47
- Widening of Bridge-Colongolo Br. (B01040mn) Along Surallah-Lake Sebu-Maitum Rd₱90,459,617.50
