J G ORANZA CONST is listed as a company organization in Philippine public procurement records on this site, with 107 linked DPWH project(s) totaling about ₱4,389,950,717.06. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
J G ORANZA CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 107
- Total value
- ₱4,389,950,717.06
- Published flags
- 6
- Region
- South Cotabato 1st DEO · Region XII
Online presence
Google Maps: JG Oranza ConstructionGoogle Maps, 2026-10-22
Purok 2, Rajah Muda, Barangay Buayan Rd, General Santos City (Dadiangas), South Cotabato
Public Record Grade
A transparent, data-derived summary of reported public records for J G ORANZA CONST — not an accusation or finding of wrongdoing.
Score: 91.90 / 100 · Projects in sample: 107 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 87.6/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 87.6
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 92
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 104
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 107
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 107
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.6/100 · Weight: 11%
- projects
- 107
- componentScore
- 98.6
- flagsPerProject
- 0.05
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 107
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 101 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN), POLOMOLOK, SOUTH COTABATO24M00123 · ₱121,496,242.95 · mapped
- Construction of Concrete Revetment, Downstream of Sinawal Bridge, Sinawal River, Barangay Labangal, General Santos City24M00162 · ₱120,624,229.70 · mapped
- Construction of River Bank Protection, Lusanes, Brgy. Sulit, Polomolok, South Cotabato24M00219 · ₱120,624,048.80 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN) PHASE II, STA. 0+000 - STA. 0+610, POLOMOLOK, SOUTH COTABATO25M00177 · ₱107,588,282.87 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, K1665+040.000-K1665+120.000, K1665+234.000-K1665+267.000, K1665+460.000-K1665+505.000, K1665+673.000-K1665+710.000, K1666+370.000-K1666+440.000, K1666+490.000-K1666+540.00022M00054 · ₱106,148,970.48 · mapped
- Construction of Badtasan River Flood Control, Kiamba, Sarangani24M00111 · ₱98,999,858.70 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA. 46+986 - STA. 47+141.65, STA. 48+749 - STA. 48+769.24, STA. 49+602 - STA. 49+665.28, BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION), TUPI, SOUTH COTABATO23M00173 · ₱96,499,966.92 · mapped
- Construction of Latian Flood Control, Alabel, Sarangani24ME0003 · ₱96,499,943.24 · mapped
- Construction of Concrete Revetment Lower Klinan-Mabuhay (Silway River Basin), Sta. 0+000 - Sta. 0+694, Brgy. Mabuhay, General Santos City22MB0014 · ₱96,498,596.33 · mapped
- Construction of Lun Masla River (Upstream) Flood Control, Malapatan Sarangani24ME0080 · ₱96,497,759.33 · mapped
- Construction of Daan Suyan-Lun Padidu River Control, Package A, Malapatan, Sarangani23M00045 · ₱96,480,601.49 · mapped
- Construction of Flood Control Structure along Barangay Maribulan, Alabel, Sarangani24ME0070 · ₱96,445,530.38 · mapped
- Construction of Concrete Revetment along Silway River, Barangay Apopong, General Santos City24M00224 · ₱96,400,433.63 · mapped
- CONSTRUCTION OF LADOL FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI25M00018 · ₱96,029,769.30 · mapped
- CONCRETING OF JCT. NHW CROSSING REPOLYO, BARANGAY LAMCALIAF - BARANGAY KINILIS ROAD, MUNICIPALITY OF POLOMOLOK23MB0109 · ₱95,531,125.23 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT, (UPSTREAM OF SOUTH POLOMOLOK BR.) PHASE II, STA 0+000 - STA 0+380 (RIGHT BANK); STA 0+000 - STA 0+220 (LEFT BANK), POLOMOLOK, SOUTH COTABATO25M00186 · ₱93,560,766.11 · mapped
- Construction of Revetment along Tinagacan-Buayan River (Phase 3), Brgy. Tinagacan, General Santos City22MB0024 · ₱91,629,683.47 · mapped
- Construction of Flood Mitigation Structure, Bagacay Creek, Barangay Bagacay, Alabel, Sarangani Province24M00112 · ₱89,000,301.34 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ALBERT MORROW BLVD - K1651 + 701 - K1653 + 730, K1653 + 780 - K1654 + 43023MB0058 · ₱88,708,814.82 · mapped
- ROAD CONCRETING, JCT. CROSSING KAWIT TO MALAGTING TO PUROK ESTREBILLA HILLS, BRGY. MALIGO, POLOMOLOK, SOUTH COTABATO23MB0108 · ₱77,199,187.32 · mapped
- Construction of Flood Mitigation Structure at Bagacay Creek, Brgy. Bagacay, Alabel, Sarangani Province23ME0054 · ₱77,188,853.74 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - KIAMBA RD - K1662 + 000 - K1662 + 96223MB0060 · ₱74,002,946.38 · mapped
- ROAD WIDENING - SURALLAH - TBOLI - SAN JOSE ROAD (GEN. SANTOS CITY), PACKAGE F, STA. 0+000 - STA. 1+700, SURALLAH, SOUTH COTABATO22M00088 · ₱67,790,797.40 · mapped
- Construction of Concrete Revetment, Makar River, Barangay Labangal, General Santos City23MB0078 · ₱65,136,465.86 · mapped
- CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOM 4 STOREY 20 CL AT NEW SOCIETY NATIONAL HIGH SCHOOL SCHOOL, BRGY. SINAWAL, GENERAL SANTOS CITY (2UNITS)16MB0039 · ₱64,683,274.80
- Construction of Revetment along Makar River, General Santos City22MB0022 · ₱62,723,813.21 · mapped
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAKAR-MARBEL RD-K1658+214-K1658+389, K1658+449 - K1659+301, K1659+424- K1660+45323MB0048 · ₱61,945,056.53 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT, SILWAY RIVER, BARANGAY DADIANGAS NORTH, GENERAL SANTOS CITY, PACKAGE 121M00025 · ₱57,990,621.39 · mapped
- CONSTRUCTION OF PNCO CONDOMINUM WITH BASEMENT PARKING, PRO 12 HEADQUARTERS, GENERAL SANTOS CITY, SOUTH COTABATO23M00063 · ₱57,899,858.02
- Construction of Concrete Revetment, Barangay Klinan 6, Polomolok, South Cotabato23MB0009 · ₱53,060,946.53 · mapped
- Construction of Concrete Revetment, Upper Silway Bridge, Silway River, General Santos City23MB0079 · ₱51,143,096.92 · mapped
- 1. PAVING OF UNPAVED ROADS - DEMOLOC-LITTLE BAGUIO-ALABEL RD, K1695+057 - K1695+146.50, ALABEL, SARANGANI; 2. PAVING OF UNPAVED ROADS - DEMOLOC-LITTLE BAGUIO-ALABEL RD, K1694+275 - K1694+349.6, ALABEL, SARANGANI;3. PAVING OF UNPAVED ROADS - DEMOLOC-LITTLE23M00035 · ₱50,225,336.17 · mapped
- CONSTRUCTION OF HEALTH EMERGENCY RESPONSE OPERATIONS CENTER, BRGY. LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO23MB0151 · ₱49,499,997.84 · mapped
- CONSTRUCTION OF FLOOD CONTROL/ CONCRETE REVETMENT ALONG SILWAY RIVER, P.I. 16, BRGY. CITY HEIGHTS, GENERAL SANTOS NCITY, SOUTH COTABATO18MB0008 · ₱48,999,989.11 · mapped
- Construction of Flood Control along Kalaong River (Upstream), Maitum, Sarangani22ME0033 · ₱48,999,481.86 · mapped
- CONSTRUCTION/REHABILITAION OF FLOOD MITIGATION FACILITIES AT MAKAR BRIDGE-I, ALONG MAKAR RIVER STA. 0+000 - STA.0+444 (LEFTSIDE RIVER BANK, UPSTREAM), GENERAL SANTOS CITY SOUTH COTABATO 1ST LD19MB0024 · ₱48,998,953.08 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT UPPER MAKAR BRIDGE, ALONG MAKAR RIVER STA. 0+000 - STA.0+390 (DOWNSTREAM), GENERAL SANTOS CITY, SOUTH COTABAT 1ST LD19MB0019 · ₱48,998,926.64 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD - K1674 + 000 - K1676 + 24723MB0004 · ₱48,998,794.66 · mapped
- CONSTRUCTION OF DATAL TAMPAL FLOOD CONTROL ALONG BUAYAN-MALUNGON RIVER BASIN; MALUNGON, SARANGANNI PROVINCE21ME0038 · ₱48,989,940.45 · mapped
- CONSTRUCTION OF ROAD, JCT NHW PARAISO - STA. MARIA, ALABEL, SARANGANI PROVINCE24ME0096 · ₱48,898,537.62 · mapped
- ROAD WIDENING - MARBEL-MAKAR RD - K1668+000 - K1669+065, POLOMOLOK, SOUTH COTABATO24M00119 · ₱48,249,943.60 · mapped
- REPLACEMENT OF BRIDGE - SALDUA BRIDGE IN POLOMOLOK, SOUTH COTABATO24M00217 · ₱48,220,235.45 · mapped
- Construction of Flood Control along Saub River Barangay Malalag, Maitum, Sarangani22ME0037 · ₱48,017,953.88 · mapped
- IMPROVEMENT/CONCRETING OF ROAD, MALALAG COGON - UPPER BIANGAN; MALUNGON, SARANGANI PROVINCE21ME0044 · ₱47,019,014.81 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - MAKAR-MARBEL RD - K1655+(-033)-K1660+45320MB0013 · ₱47,015,261.80 · mapped
- Construction of Flood Control/Concrete Revetment along Tinagacan-Buayan River (Phase 2), Barangay Tinagacan, General Santos City21MB0022 · ₱45,389,626.18 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT NHW BIWANG-DAGUMA-KAPAYA TO JCT. NHW-NAKAN ROAD IN SUPPORT TO BANANA, RICE, CORN, COCONUT, MONGGO, POULTRY/EGGS AND PIGGERY, STA.0+700.00-STA.1+147.43, STA.1+171.69 - STA.2+195.40, BAGUMBAYAN, SULTAN KUDARAT25M00078 · ₱44,779,708.53 · mapped
- CONSTRUCTION OF ROAD, SITIO SIGUEL TO SITIO LAMLANGIL, BRGY. TINOTO, MAASIM, SARANGANI, PROVINCE22ME0002 · ₱43,217,336.50 · mapped
- CONCRETING OF ROAD, PUROK NANGKA, BRGY. CONEL TO PUROK 3, BRGY. KATANGAWAN, GENERAL SANTOS CITY21MB0018 · ₱43,000,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT UPPER MAKAR BRIDGE I ALONG MAKAR RIVER, STA. 0+000-STA. 0+488, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LD17MB0022 · ₱41,045,141.81 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
