Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22LB0290 was awarded at 100.00% of its ABC. Across its 29 recorded contracts, GENESIS88 CONST INC was awarded at ≥99.5% of ABC 29 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to maximize their chances of winning while staying within legal limits.

Public record entityRehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Saavedra Relocation Section, Right Bank) going to Matina River Outfall, Davao City
LocationDAVAO CITY (DAVAO DEL SUR), DAVAO DEL SUR, Region XIContract 22LB0290
Amount₱96,500,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Saavedra Relocation Section, Right Bank) going to Matina River Outfall, Davao City22LB0290Flood control100%July 15, 2023April 15, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: June 5, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Davao City District Engineering Office",
  "ratio": 1,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "22LB0290",
  "contractor": "GENESIS88 CONST INC",
  "contractCostPhp": 96500000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)City of DavaoMatina Pangi
Storms whose wind field reached it
Jelawat 2023
Hazard exposure
Active fault2.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.