Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 12 contracts awarded to W J P CONST AND SUPPLY by the same office started within 79 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 10 in the same municipality. It is possible these are legitimately separate works in different locations or phases, as indicated by the package numbers and barangay/river names.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 8)24AI0025 | 100% | September 8, 2024 | May 31, 2024 | — | completedsumbong source |
Start: February 21, 2024 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold in one municipality
{
"deo": "Pangasinan 3rd District Engineering Office",
"contractId": "24AI0025",
"contractor": "W J P CONST AND SUPPLY",
"windowDays": 120,
"clusterSize": 12,
"thresholdPhp": 50000000,
"contractCostPhp": 48920129.97,
"maxInOneMunicipality": 10