Construction of Revetment24AI0025

Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 8)

Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 8) is a DPWH-tracked public work in BINALONAN (PANGASINAN), PANGASINAN, Region I. Reported contract value: ₱48,920,129.97. Status: Reported complete (DPWH). Contractor on record: W J P CONST AND SUPPLY. Figures trace to sumbong.

BINALONAN (PANGASINAN), PANGASINAN, Region I
Region: Region I

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.98

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-24-0007434 · ₱1,946,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱48,264,068 · W.J.P CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-02-18 → 2025-11-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Pangasinan

Based on the coordinates published with the DPWH record and NOAH file Pangasinan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 8)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan ( Package 1 )
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0007434

₱1,946,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0003000

₱441,770.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0007435

₱180,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0001275

₱159,815.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱48,920,129.97

Progress

Reported complete (DPWH)

Start Date

February 21, 2024

Target End

September 8, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.