Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Agusan del Sur 2nd District Engineering Office awarded 29 of 29 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 3.8e-05), across 15 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from highly competitive bidding or precise cost estimation by the office.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Agusan del Sur 2nd District Engineering Office: contracts
29 of 29 contracts (100%) at ≥99.5% of ABC · peer baseline 70.4% · gap +29.6 pts · binomial p = 3.8e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22NC0035 | Construction of River Bank Protection along Ihawan River Phase III, Sta. 0+095.00 - Sta. 0+210.00, Loreto, Agusan del Sur | DAVE CONST / CM TAN CONST | 100.00% | DPWH |
| 24NC0004 | Construction of Riverbank Protection Structure, Barangay Johnson, Loreto, Agusan Del Sur | DAVE CONST | 100.00% | DPWH |
| 21NC0075 | Rehabilitation of Minabang Creek, Sta. 0 + 000 - Sta. 0 + 300, Agusan del Sur | A T DUMLAO CONST INC FORMERLYANDONI T D / LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST | 100.00% | DPWH |
| 23NC0020 | Rehabilitation of Simulao River Bank Protection Near Sta. Maria Bridge Approach ''B'' Upstream, Trento, Agusan del Sur | ADFIL CORP | 100.00% | DPWH |
| 23NC0044 | Construction of river bank protection along Ihawan River, Barangay Johnson, Loreto, Agusan del Sur | DAVE CONST | 100.00% | DPWH |
| 21NC0077 | Construction of River Bank Protection of Ihawan River, Sta. 0 + 000 - Sta. 0 + 165, Agusan del Sur | DAVE CONST / FFJJ CONST | 100.00% | DPWH |
| 23NC0073 | Construction of Drainage Canal along Anahaw Street, San Francisco, Agusan del Sur | DAVE CONST | 100.00% | DPWH |
| 24NC0029 | Construction of Simulao River Bank Protection, Near Sta. Maria Bridge Approach ''B'', Upstream, Phase II, Trento, Agusan del Sur | JQG BUILDERS | 100.00% | DPWH |
| 23NC0033 | Construction of Riverbank Protection, Barangay Johnson, Loreto, Agusan Del Sur | DAVE CONST | 100.00% | DPWH |
| 24NC0028 | Construction of Simulao Riverbank Protection, Near Sta. Maria Bridge Approach ''B'', Upstream, Trento, Agusan del Sur | BBC CONST / ADFIL CORP | 100.00% | DPWH |
| 21NC0076 | Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 160, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 23NC0011 | Construction of bank protection along Agusan River (Protecting Sta. Josefa-Pulang Lupa Tertiary Road), Phase II, Sta. Josefa, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 24NC0010 | Construction of Agusan River Flood Control, Near Veruela Municipal Office, Veruela, Agusan del Sur | ROCK DIWATA BUILDERS INC | 100.00% | DPWH |
| 22NC0049 | Desilting of Solibao River (Phase I), Barangay Libuac & Barangay Poblacion, Rosario, Agusan del Sur | ARQ BUILDERS / MONOLITHIC CONST & CONCRETE PRODUCTS INC | 100.00% | DPWH |
| 24NC0046 | Construction of Flood Mitigation Structure along Adlayan Riverbank (Upstream), Agusan del Sur | YES CONST / ARN BUILDERS INC FOR: ARN BUILDERS | 100.00% | DPWH |
| 23NC0056 | Flood Mitigation along Adlayan River Bank (Downstream) San Francisco, Agusan Del Sur | YES CONST / ARN BUILDERS INC FOR: ARN BUILDERS | 100.00% | DPWH |
| 24NC0023 | Construction of Bank Protection of Bahayan River, near Primary Road (NRJ Cuevas-Bislig Road), Phase II, P-4 Duranta, Barangay Cuevas, Trento, Agusan del Sur | ROCK DIWATA BUILDERS INC | 100.00% | DPWH |
| 22NC0044 | Construction of Flood Mitigation Structure, Solibao River Flood Control, Rosario, Agusan Del Sur | VICENTE T LAO CONST | 100.00% | DPWH |
| 22NC0042 | Construction of Agusan River Flood Control, Sta. Josefa, Agusan Del Sur | VICENTE T LAO CONST | 100.00% | DPWH |
| 22NC0034 | Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 - Sta. 0+090.00, Rosario, Agusan del Sur | INNOVATI CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23NC0045 | Flood Mitigation along Adlayan River Bank (Upstream) San Francisco, Agusan Del Sur | YES CONST / ARN BUILDERS INC FOR: ARN BUILDERS | 100.00% | DPWH |
| 22NC0041 | Construction of Flood Control Structures along Solibao River Protecting Solibao Bridge, Rosario, Agusan del Sur | CM TAN CONST | 100.00% | DPWH |
| 24N00132 | Construction of Agusan River Flood Control (Phase III), Veruela, Agusan del Sur | ROCK DIWATA BUILDERS INC | 100.00% | DPWH |
| 23N00104 | Construction of Agusan River Flood Control, Barangay Poblacion, Veruela, Agusan del Sur | ROCK DIWATA BUILDERS INC / FFJJ CONST | 100.00% | DPWH |
| 22NC0043 | Construction of Flood Mitigation Structure, Adgawan River Flood Control (Phase II) La Paz, Agusan Del Sur | VICENTE T LAO CONST | 100.00% | DPWH |
| 24N00093 | Construction of Agusan River Flood Control (Phase II), Veruela, Agusan del Sur | ROCK DIWATA BUILDERS INC | 100.00% | DPWH |
| 23N00105 | Construction of Flood Control Structures along Solibao River Protecting Solibao Bridge, Rosario, Agusan del Sur | CM TAN CONST | 100.00% | DPWH |
| 23N00103 | Construction of Bank Protection along Solibao River Upstream, Agusan del Sur, Caraga | CM TAN CONST | 100.00% | DPWH |
| 23N00102 | Construction of Bank Protection along Solibao River Downstream, Agusan del Sur, Caraga | CM TAN CONST | 100.00% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Agusan del Sur 2nd District Engineering Office",
"nearAbc": 29,
"trigger": "office_pattern_aggregate",
"officeId": "a9fad606-57ad-5b9f-a6e0-7006f7408ab0",
"threshold": 0.995,
"binomialTailP": 0.00003799726518450289,
"nearAbcRatePct": 100,
"totalContracts": 29,
"baselineRatePct": 70.4,
"excessPctPoints": 29.6,
"expectedNearAbc": 20.4,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"