Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: J G ORANZA CONST received 28.4% (₱748.13M of ₱2.64B) of recorded flood-control contract value in Sarangani District Engineering Office across 28 contracts and 12 contractors, at or above the 25% share threshold (HHI 0.126). This may reflect the contractor's strong track record or capacity in the area.

Public record entityJ G ORANZA CONSTOrganization record →
LocationSarangani District Engineering Office
Amount₱748,130,283.9628.4% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Sarangani District Engineering Office

Reported complete (DPWH): 9Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Badtasan River Flood Control, Kiamba, Sarangani24M00111Flood control100%March 7, 2025November 21, 2024—completedsumbong source
Construction of Daan Suyan-Lun Padidu River Control, Package A, Malapatan, Sarangani23M00045Flood control100%June 20, 2024April 15, 2024—completedsumbong source
Construction of Flood Control along Kalaong River (Upstream), Maitum, Sarangani22ME0033Flood control100%March 28, 2023March 28, 2023—completedsumbong source
Construction of Flood Control along Saub River Barangay Malalag, Maitum, Sarangani22ME0037Flood control100%September 24, 2022September 22, 2022—completedsumbong source
Construction of Flood Control Structure along Barangay Maribulan, Alabel, Sarangani24ME0070Flood control100%January 29, 2025October 21, 2024—completedsumbong source
Construction of Flood Mitigation Structure at Bagacay Creek, Brgy. Bagacay, Alabel, Sarangani Province23ME0054Flood control100%January 26, 2024December 15, 2023—completedsumbong source
Show 3 more projects in this bucket
Construction of Flood Mitigation Structure, Bagacay Creek, Barangay Bagacay, Alabel, Sarangani Province24M00112Flood control100%February 17, 2025February 17, 2025—completedsumbong source
Construction of Latian Flood Control, Alabel, Sarangani24ME0003Flood control100%December 15, 2024December 11, 2024—completedsumbong source
Construction of Lun Masla River (Upstream) Flood Control, Malapatan Sarangani24ME0080Flood control100%January 29, 2025November 20, 2024—completedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.12649648310664424,
  "scope": "deo",
  "bucketKey": "deo:Sarangani District Engineering Office",
  "contractor": "J G ORANZA CONST",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 2635984524.91,
  "contractorShare": 0.2838143687454096,
  "contractorTotalPhp": 748130283.96,
  "contractorContracts": 9
}

Possible Innocent Explanations

  • This may reflect the contractor's strong track record or capacity in the area.