Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: GICAR CONST INC holds 26 flood-control contracts worth ₱2.27B, 2.24× the 95th-percentile contractor total (₱1.01B); up to 11 ran at the same time. This is a capacity question worth examining. This may reflect the contractor's strong capacity or specialization in flood-control projects.

Public record entityGICAR CONST INCOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 26Ongoing: 0Delayed: 0Status unknown: 0
Show 20 more projects in this bucket
Construction of Flood Mitigation Structure along Hinagasan River, Sison, Surigao del Norte23N00133Flood control100%March 21, 2024March 21, 2024—completedsumbong source
Construction of Flood Mitigation Structure along Magallanes River, Barangay Sico-Sico, Gigaquit, Surigao del Norte24NG0018Flood control100%February 19, 2025July 31, 2024—completedsumbong source
Construction of Flood Mitigation Structure along Surigao River, Barangay Quezon, Surigao City, Surigao del Norte23NG0023Flood control100%February 1, 2024March 4, 2024—completedsumbong source
Construction of Flood Mitigation Structure along Surigao River, Barangay Trinidad, Surigao City, Surigao del Norte22NG0009Flood control100%May 7, 2023March 15, 2023—completedsumbong source
Construction of Langtad, Argao Flood Control (Downstream), Barangay Langtad, Argao, Cebu24HG0006Flood control100%December 30, 2024December 30, 2024—completedsumbong source
Construction of Magsaysay River Revetment, Barangay Magsaysay, Dinagat, Dinagat Islands24NE0023Flood control100%December 15, 2024December 13, 2024—completedsumbong source
Construction of Magtiaco River Flood Control along Magtiaco River, Barangay San Pedro, Alegria, Surigao del Norte22NG0055Flood control100%December 10, 2022December 9, 2022—completedsumbong source
Construction of Revetment along Surigao River, Poctoy Section, Phase 1, Surigao City, Surigao del Norte24N00148Flood control100%March 8, 2025February 27, 2025—completedsumbong source
Construction of Revetment Wall at Sitio Luwak, Barangay Salmeron, Malabuyoc, Cebu24HO0016Flood control100%February 19, 2025June 18, 2024—completedsumbong source
Construction of River Control Structure, Sison, Surigao del Norte22NG0017Flood control100%December 25, 2022November 30, 2022—completedsumbong source
Construction of Riverbank in Barangay Tagbuyawan, Mainit, Surigao del Norte22NG0029Flood control100%January 15, 2023January 13, 2023—completedsumbong source
Rehabilitation/ Reconstruction of Cansayong Flood Control, Barangay Cansayong, Malimono, Surigao del Norte23NG0129Flood control100%February 5, 2025November 26, 2024—completedsumbong source
Rehabilitation/ Reconstruction of Tinago Flood Control, Left Bank, Barangay Tinago, Malimono, Surigao del Norte23NG0125Flood control100%March 19, 2025December 15, 2024—completedsumbong source
Rehabilitation/Reconstruction of Scoured Revetment at Approach ''B'' (Upstream-Right Side) along Surigao-Davao Coastal Road/Tago-Gamut Bridge, Gamut-Tago, Surigao del Sur, Sta. 0+000 - Sta. 0+282.5923NH0084Flood control100%March 12, 2024March 4, 2024—completedsumbong source
Construction of Cagayan de Oro Drainage System (Diversion Channel along Kauswagan - Bayabas Section) Package 5, Cagayan de Oro City21K00236100%December 31, 2023December 31, 2023—completedsumbong source
Construction of Drainage System (Bonbon - Kauswagan Section), Package 12, Sta. 0+000.00 - Sta. 1+536.00, Cagayan de Oro City22K00073100%August 18, 2024August 18, 2024—completedsumbong source
Construction of Revetment along Surigao River, Luna Section, Surigao City, Surigao del Norte23NG0041100%April 21, 2024December 19, 2023—completedsumbong source
Construction of Revetment along Surigao River, Togbongon Section, Surigao City, Surigao del Norte23NG0042100%April 19, 2024April 14, 2024—completedsumbong source
Construction of Revetment Wall at Sitio Kang-Irong - Sitio Luwak, Brgy. Salmeron, Malabuyoc, Cebu23HO0004100%December 19, 2023November 24, 2023—completedsumbong source
Construction of Slope Protection System along Panas Road, Barangay Panas (Phase III), Consolacion, Cebu23HN0098100%December 23, 2023December 15, 2023—completedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "GICAR CONST INC",
  "projectCount": 26,
  "totalValuePhp": 2272196917.5899997,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name
  • This may reflect the contractor's strong capacity or specialization in flood-control projects.