Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Cross-Source Mismatch (PhilGEPS vs DPWH)

Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: PhilGEPS award 21NH0092 lists ₱74.30M to ARQ BUILDERS, while DPWH records contract 21NH0092 at ₱81.72M to ARQ BUILDERS. The contract amount may have increased after the award due to approved variation orders or scope changes.

Public record entityConstruction of Dike Revetment along Liangan River, Lianga, Surigao del Sur
LocationSURIGAO DEL SUR, Region XIIIContract 21NH0092
Amount₱81,722,678.26 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Dike Revetment along Liangan River, Lianga, Surigao del Sur21NH0092Flood control100%December 30, 2022January 9, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: January 18, 2022 · Source fetched October 21, 2026

Rule Definition

Compares linked award and project contractor/cost above tolerance.

Triggering Data & citations

Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record

{
  "linkId": "169c4b67-d12d-4605-84c5-34af9e9c1c4c",
  "awardId": "97bbcc78-ba67-47f2-b31b-e865cbe457af",
  "linkScore": 1,
  "nameMismatch": false,
  "amountMismatch": true,
  "awardAmountPhp": 74296837.66,
  "linkValidation": "philgeps_ref equals DPWH contract ID",
  "projectCostPhp": 81722678.26,
  "philgepsAwardee": "ARQ BUILDERS"
}

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del SurLiangaBanahao
Storms whose wind field reached it
Penha 2026Koto 2025
Hazard exposure
Active fault7.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA2 (3.01-4 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.