Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Pangasinan 2nd District Engineering Office awarded 56 of 63 recorded flood-control contracts (88.9%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (18.5 percentage points higher; binomial p = 4.4e-04), across 19 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from highly competitive bidding or careful cost estimation by the office.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Pangasinan 2nd District Engineering Office: contracts
56 of 63 contracts (88.9%) at ≥99.5% of ABC · peer baseline 70.4% · gap +18.5 pts · binomial p = 4.4e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 23A00281 | Construction of Riverbank Protection along Sinucalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan | BET CONST & SUPPLY | 100.00% | DPWH |
| 22AH0067 | Construction of Drainage System along Pangasinan- La Union National Highway (Mangaldan Section) from Barangays Poblacion, Anolid, Malabago and Bari in Mangaldan | BET CONST & SUPPLY / MIGHTYWAY CONST AND SUPPLY | 100.00% | DPWH |
| 22A00009 | Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase I | BET CONST & SUPPLY | 100.00% | DPWH |
| 24AH0130 | Construction of River Bank Protection, Barangay San Jose, Aguilar, Pangasinan | MIGHTYWAY CONST AND SUPPLY | 100.00% | DPWH |
| 24AH0056 | Construction of Drainage System at Barangay Bari, Mangaldan, Pangasinan | MIGHTYWAY CONST AND SUPPLY | 100.00% | DPWH |
| 22A00011 | Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase III | BET CONST & SUPPLY | 100.00% | DPWH |
| 22A00209 | Construction of Slope Protection, Barangays Embarcadero, Macayug, Inlambo, Navaluan, Osiem and Landas, Mangaldan, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 100.00% | DPWH |
| 22A00010 | Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase II | BET CONST & SUPPLY | 100.00% | DPWH |
| 24A00293 | Construction of Riverbank Protection along Sinucalan River, Brgy. Lasip Chico, Dagupan City, Pangasinan | BMK CONST CORP FORMERLY B M K CONST | 100.00% | DPWH |
| 23A00233 | Construction of Riverbank Protection along Agno River, Barangay Panacol, Aguilar, Pangasinan, Phase II | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 100.00% | DPWH |
| 24A00180 | Construction of Flood Control Project along Agno River, Barangay San Jose, Aguilar, Pangasinan | RANIA CONST AND SUPPLIES / JHI CONST & SUPPLY | 100.00% | DPWH |
| 22A00305 | Construction Of Riverbank Protection along Barangay Pogo Grande-Barangay Lasip Grande, Dagupan City, Pangasinan | BET CONST & SUPPLY | 100.00% | DPWH |
| 24A00201 | Construction of Riverbank Protection along Agno River, Barangay Panacol, Aguilar, Pangasinan, Phase III | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 100.00% | DPWH |
| 22A00184 | Construction of River Bank Protection along Bued River, Brgy. Macayug, Mangaldan, Pangasinan | FORTHRIGHT CONST | 100.00% | DPWH |
| 24A00192 | Construction of Flood Mitigation Structure along Bued River-Angalacan River, Barangay Imelda-San Roque, San Jacinto, Pangasinan | BET CONST & SUPPLY | 100.00% | DPWH |
| 22A00183 | Construction of Flood Mitigation Structures along Bued River, Brgy. Bolo-Labney, San Jacinto, Pangasinan, Sta. 0 + 770 - Sta. 1 + 540 | TG SURCON BUILDERS INC / FRAMECON BUILDERS | 100.00% | DPWH |
| 23A00259 | Rehabilitation of Flood Control System, Barangay Bañaga, Bugallon, Pangasinan | ALCEL CONST | 100.00% | DPWH |
| 23A00260 | Rehabilitation of Flood Control System, Barangay Salasa, Bugallon, Pangasinan | GEORAVIN CONST & SUPPLIES / ALCEL CONST | 100.00% | DPWH |
| 23A00188 | Construction of Flood Mitigation Structure along Bued River, Barangay Anonang, San Fabian, Pangasinan, Phase II | BET CONST & SUPPLY | 100.00% | DPWH |
| 22AH0017 | Construction of Riverbank Protection along Agno River Basin, Brgy. San Jose, Aguilar, Pangasinan | GOLDRICH CONST & TRADING | 100.00% | DPWH |
| 24A00229 | Construction of Flood Mitigation Structure along Bued River, Barangay Bolo, San Jacinto, Pangasinan, Phase II | BET CONST & SUPPLY | 100.00% | DPWH |
| 23A00238 | Construction of River Bank Protection, Brgy. Sto. Tomas-Casibong, San Jacinto, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 23AH0070 | Construction of Riverbank Protection, Brgy. Lelemaan, Manaoag, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0068 | Construction of Riverbank Protection along Barangay Calmay, Dagupan City, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0112 | Rehabilitation of Riverbank Protection along Aloragat River at Brgy. Nalsian, Manaoag, Pangasinan | MIGHTYWAY CONST AND SUPPLY | 99.99% | DPWH |
| 22AH0056 | Construction of Riverbank Protection Structure along Barangay Pantal, Dagupan City, Pangasinan | ARCINUE COMM'L CORP | 99.99% | DPWH |
| 22AH0069 | Construction of Riverbank Protection at Brgy. Pao, Manaoag, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0013 | Construction of Riverbank Protection along Agno River Basin, Brgy. Dorongan Valerio, Mangatarem, Pangasinan | ALCEL CONST | 99.99% | DPWH |
| 22AH0016 | Construction of Riverbank Protection along Agno River Basin, Brgy. Umanday, Bugallon, Pangasinan | ALCEL CONST | 99.99% | DPWH |
| 23AH0071 | Construction of Riverbank Protection Pantal River, Dagupan City, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0014 | Construction of Riverbank Protection along Agno River Basin, Brgy. Bolaoen, Bugallon, Pangasinan | PANGASINAN NEW WILSON LUMBER & CONST SUPPLY | 99.99% | DPWH |
| 23AH0072 | Construction of Riverbank Protection Sinucalan River, Brgy. Lasip Grande, Dagupan City, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0144 | Construction of Riverbank Protection, Brgy. Sapang, Manaoag, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.99% | DPWH |
| 23A00239 | Construction of River Bank Protection, Brgy. Sto. Tomas, San Jacinto, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0135 | Construction of Riverbank Protection Structure at Brgy. Sapang, Manaoag, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 24AH0108 | Construction of Riverbank Protection along Sinucalan River, Barangay Calmay-Barangay Carael, Dagupan City, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.99% | DPWH |
| 22AH0012 | Construction of Riverbank Protection along Agno River Basin at Brgy. Cabayaoasan, Bugallon, Pangasinan | ALCEL CONST | 99.99% | DPWH |
| 23AH0077 | Construction of Riverbank Protection, Brgy. Embarcadero, Mangaldan, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 22AH0126 | Construction of Riverbank Protection at Brgy. Sapang, Manaoag, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 23AH0076 | Construction of Riverbank Protection, Brgy. Lipit Norte, Manaoag, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.99% | DPWH |
| 23A00235 | Construction of Flood Control Structure along Bued River, Brgy. Osiem, Mangaldan, Pangasinan | BET CONST & SUPPLY | 99.99% | DPWH |
| 23AH0075 | Construction of Riverbank Protection, Brgy. Lipit Sur, Manaoag, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.99% | DPWH |
| 22AH0015 | Construction of Riverbank Protection along Agno River Basin, Brgy. Angarian, Bugallon, Pangasinan | PANGASINAN NEW WILSON LUMBER & CONST SUPPLY | 99.99% | DPWH |
| 22AH0071 | Construction of Riverbank Protection at Brgy. Sapang, Manaoag, Pangasinan | BET CONST & SUPPLY | 99.98% | DPWH |
| 23AH0073 | Construction of Riverbank Protection, Brgy. Poblacion, Manaoag, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.98% | DPWH |
| 23AH0069 | Construction of Riverbank Protection, Brgy. Pugaro, Manaoag, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.97% | DPWH |
| 23AH0088 | Construction of Slope Protection at Brgy. Sto Thomas, San Jacinto, Pangasinan | ZOTA TRADING & CONST | 99.97% | DPWH |
| 23AH0043 | Construction of Slope Protection at Barangay Bantayan, Mangaldan, Pangasinan | ZOTA TRADING & CONST | 99.96% | DPWH |
| 22AH0133 | Construction of Drainage Structure at Brgy. Bonuan Gueset, Dagupan City, Pangasinan | ZOTA TRADING & CONST | 99.96% | DPWH |
| 22AH0034 | Construction of Flood Control / Drainage System, Barangay Camaley, Binmaley, Pangasinan | ST ALMERS CONST AND ENT | 99.95% | DPWH |
| 23AH0028 | Construction of Riverbank Protection, Barangay Takipan, Mangatarem, Pangasinan | CHIARA2300 INC / BERSON'S CONST & TRADING | 99.94% | DPWH |
| 22AH0134 | Construction of Drainage Structure at Brgy. Maasin, Mangaldan, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.94% | DPWH |
| 23AH0040 | Construction of Drainage System at Barangay Bagong Pag-asa, San Jacinto, Pangasinan | MIGHTYWAY CONST AND SUPPLY | 99.92% | DPWH |
| 23AH0042 | Construction of Drainage System at Barangay Maasin, Mangaldan, Pangasinan | J G GARCIA CONST & SUPPLY FOR: J G GARCIA CONST | 99.89% | DPWH |
| 23AH0039 | Construction of Drainage System at Barangay Anolid, Mangaldan, Pangasinan | MIGHTYWAY CONST AND SUPPLY | 99.89% | DPWH |
| 23AH0041 | Construction of Drainage System at Barangay Cayanga, San Fabian, Pangasinan | MIGHTYWAY CONST AND SUPPLY | 99.82% | DPWH |
| 22AH0072 | Construction of Riverbank Protection at Sitio Manggaan, Brgy. Lelemaan, Manaoag, Pangasinan | BET CONST & SUPPLY | 98.98% | DPWH |
| 22AH0018 | Construction of Riverbank Protection along Agno River Basin, Brgy. Baybay, Aguilar, Pangasinan | ALCEL CONST | 98.23% | DPWH |
| 22AH0057 | Construction of Riverbank Protection Structure along Sinocalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan | BET CONST & SUPPLY | 97.02% | DPWH |
| 22AH0070 | Construction of Riverbank Protection at Brgy. Pugaro, Manaoag, Pangasinan | BET CONST & SUPPLY | 97.01% | DPWH |
| 22AH0033 | Construction of Flood Control / Drainage System, Barangay Buenlag, Binmaley, Pangasinan | ST ALMERS CONST AND ENT | 96.77% | DPWH |
| 22AH0136 | Construction of Riverbank Protection at Barangay Oraan West, Manaoag, Pangasinan | BET CONST & SUPPLY | 96.03% | DPWH |
| 22AH0058 | Construction of Riverbank Protection Structure, Barangay Bonuan Binloc, Dagupan City, Pangasinan | R A MATIAS CONST AND DEVELOPERS INC FORMERLY : R A MATIAS CONST AND DEVELOPERS | 95.00% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Pangasinan 2nd District Engineering Office",
"nearAbc": 56,
"trigger": "office_pattern_aggregate",
"officeId": "af345095-e401-5c8a-8d74-683364ba6fc6",
"threshold": 0.995,
"binomialTailP": 0.00044304763775478243,
"nearAbcRatePct": 88.9,
"totalContracts": 63,
"baselineRatePct": 70.4,
"excessPctPoints": 18.5,
"expectedNearAbc": 44.4,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"