Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: QM BUILDERS holds 88 flood-control contracts worth ₱6.96B, 6.87× the 95th-percentile contractor total (₱1.01B); up to 45 ran at the same time. This is a capacity question worth examining. The contractor may have exceptional capacity or specialization in flood-control projects, allowing them to handle a large volume of contracts.

Public record entityQM BUILDERSOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 40Ongoing: 0Delayed: 0Status unknown: 0
Show 34 more projects in this bucket
Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Sto Niño, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu22HO0074Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Balili-Toledo Road, Barangay Madridejos, Alegria, Cebu22HO0072Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Felomina - Brgy. Madridejos, Sta. 0 + 000 - Sta. 0 + 167.00, Alegria, Cebu22HO0079Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Felomina, Sta. 0 + 000 - Sta. 0 + 167.00, Alegria, Cebu22HO0077Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi to Brgy. Poblacion, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu22HO0086Flood control100%December 17, 2022December 17, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu22HO0087Flood control100%December 17, 2022December 17, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Road, Barangay Madridejos, Alegria, Cebu22HO0078Flood control100%October 26, 2022October 26, 2022—completedsumbong source
Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 1)23HO0193Flood control100%January 13, 2024October 19, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 2)23HO0201Flood control100%March 6, 2024January 11, 2024—completedsumbong source
Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 3)23HO0202Flood control100%March 6, 2024September 21, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Barangay Poblacion, Ginatilan, Cebu (Package 2)23HO0199Flood control100%February 19, 2024September 25, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Brgy. Poblacion, Ginatilan, Cebu (Package 1)23HO0187Flood control100%February 19, 2024December 11, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Kalubihan, Barangay Guiwanon, Ginatilan, Cebu (Package 2)23HO0200Flood control100%February 19, 2024December 11, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Kasay, Barangay Looc, Ginatilan, Cebu (Package 2)23HO0203Flood control100%November 13, 2023November 13, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Kasay, Brgy. Looc, Ginatilan, Cebu (Package 1)23HO0189Flood control100%February 11, 2024December 11, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Lutak, Brgy. Guiwanon, Ginatilan, Cebu (Package 1)23HO0194Flood control100%November 13, 2023November 13, 2023—completedsumbong source
Construction of Storm Surge Protection Strucures at Sitio Balhaan, Brgy. Looc, Ginatilan, Cebu (Package 1)23HO0192Flood control100%February 4, 2024December 11, 2023—completedsumbong source
Construction of Tanjay River Control Structure, Tanjay City, Negros Oriental24HK0106Flood control100%December 9, 2024December 9, 2024—completedsumbong source
Construction of Tapon-Tangil Seawall, Dumanjug, Cebu21HO0002Flood control100%October 8, 2022October 8, 2022—completedsumbong source
Construction of Ylaya Flood Control (Upstream), Ylaya, Dumanjug, Cebu22HO0002Flood control100%September 26, 2022September 26, 2022—completedsumbong source
Improvement of Riverbank along Parale River, Sta. 0 + 000 - Sta. 0 + 700, Malabuyoc, Cebu22HO0048Flood control100%January 24, 2023January 24, 2023—completedsumbong source
Improvement of Riverbank, Sta. 0 + 000 - Sta. 0 + 651, Madredijos, Alegria, Cebu22HO0050Flood control100%January 24, 2023January 24, 2023—completedsumbong source
Reconstruction of Flood Control along Santander-Barili-Toledo Road, K0065+400 - K0065+70023HF0113Flood control100%November 10, 2024November 8, 2024—completedsumbong source
Reconstruction of Tugas-Polo Seawall, Tanjay City, Negros Oriental22HK0044Flood control100%November 9, 2022November 9, 2022—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Damaged Alegria River Flood Control System (Upstream), Alegria, Cebu, Sta. 0+000.00 to Sta. 0+252.0023HO0237Flood control100%June 8, 2024June 8, 2024—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Downstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+10223HO0240Flood control100%March 13, 2024December 18, 2023—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Upstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+16223HO0231Flood control100%May 27, 2024May 27, 2024—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Ginatilan River Flood Control System, Ginatilan, Cebu, Sta. 0+000.00 to Sta. 0+130.0023HO0230Flood control100%June 6, 2024April 24, 2024—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Parale River Flood Control System (Downstream), Malabuyoc, Cebu, Sta. 0+000 to Sta. 0+13123HO0229Flood control100%July 3, 2024July 3, 2024—completedsumbong source
Construction of Alegria Seawall Protection Structure, Alegria, Cebu23HO0069100%October 11, 2023October 11, 2023—completedsumbong source
Construction of Groundsill at Montañeza River, Malabuyoc, Cebu23HO0024100%July 13, 2024July 13, 2024—completedsumbong source
Construction of Revetment Wall along Alegria River, Alegria, Cebu23HO0055100%January 30, 2024August 14, 2023—completedsumbong source
Construction of Revetment Wall along Malbog River, Alegria, Cebu23HO0060100%October 10, 2023August 22, 2023—completedsumbong source
Construction of Revetment Wall along Montañeza (Upstream), Malabuyoc, Cebu23HO0025100%December 18, 2023December 18, 2023—completedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "QM BUILDERS",
  "projectCount": 88,
  "totalValuePhp": 6963252374.050004,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name