Repair/ Rehabilitation/ Reconstruction of Damaged Alegria River Flood Control System (Upstream), Alegria, Cebu, Sta. 0+000.00 to Sta. 0+252.00
Repair/ Rehabilitation/ Reconstruction of Damaged Alegria River Flood Control System (Upstream), Alegria, Cebu, Sta. 0+000.00 to Sta. 0+252.00 is a DPWH-tracked public work in ALEGRIA (CEBU), CEBU, Region VII. Reported contract value: ₱94,373,513.88. Status: Reported complete (DPWH). Contractor on record: QM BUILDERS. Figures trace to sumbong.
Total Contract Cost
