Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24LD0081 was awarded at 100.00% of its ABC. Across its 115 recorded contracts, LEGACY CONST CORP FORMERLY: LEGACY CONST was awarded at ≥99.5% of ABC 100 times (87.0%), versus 70.4% for flood-control contracts overall. This may occur if the winning bid exactly matched the ABC, possibly due to precise cost estimation or lack of competition.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Padada-Mainit River (Tanwalang-Upper Katipunan Section 1), Sulop, Davao del Sur24LD0081Flood control | 100% | December 28, 2024 | December 28, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: May 2, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Davao del Sur District Engineering Office",
"ratio": 1,
"abcPhp": 96500000,
"threshold": 0.995,
"contractId": "24LD0081",
"contractor": "LEGACY CONST CORP FORMERLY: LEGACY CONST",
"contractCostPhp": 96500000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
