Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CJ0097 (₱41.15M) is recorded as completed in 70 days against 172 planned; similar-cost projects take a median of 239 days, putting it in the fastest 2.0%. The contractor may have deployed extra resources or worked in favorable conditions, allowing for faster completion.

Public record entityConstruction of Slope Protection along Camiling River, Left Bank, Anoling 1st to Pao 2nd Section (Segment D), Camiling River
LocationCAMILING (TARLAC), TARLAC, Region IIIContract 24CJ0097
Amount₱41,151,460.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection along Camiling River, Left Bank, Anoling 1st to Pao 2nd Section (Segment D), Camiling River24CJ0097100%August 30, 2024May 20, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 11, 2024 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2024-03-11T00:00:00.000Z",
  "contractId": "24CJ0097",
  "actualEndDate": "2024-05-20T00:00:00.000Z",
  "targetEndDate": "2024-08-29T00:00:00.000Z",
  "contractCostPhp": 41151460
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacCamilingTelbang
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault5.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.