Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24OE0116 was awarded at 100.00% of its ABC. Across its 48 recorded contracts, TOPNOTCH CATALYST BUILDERS INC was awarded at ≥99.5% of ABC 45 times (93.8%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or rounding to match the ABC exactly.

Public record entityRehabilitation of Drainage System at Zone 41-57 (Phase 3), Manila City
LocationCITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital RegionContract 24OE0116
Amount₱29,086,241.46100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Drainage System at Zone 41-57 (Phase 3), Manila City24OE0116100%March 6, 2025February 10, 2025—completedsumbong source

Start: February 12, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "North Manila District Engineering Office",
  "ratio": 0.9999997603678585,
  "abcPhp": 29086248.43,
  "threshold": 0.995,
  "contractId": "24OE0116",
  "contractor": "TOPNOTCH CATALYST BUILDERS INC",
  "contractCostPhp": 29086241.46
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to precise cost estimation or rounding to match the ABC exactly.