Contractor Concentration (Flood Control)
A contractor holds a very large share of flood-control contract value in a district or province.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: JTM CONST / EGB CONST CORP FORMERLY: EGB CONST received 38.0% (₱250.76M of ₱660.51M) of recorded flood-control contract value in Lower Kalinga District Engineering Office across 15 contracts and 11 contractors, at or above the 25% share threshold (HHI 0.216). This may be due to the contractor's strong track record or specialization in flood-control projects in the area.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Flagged peer group: Lower Kalinga District Engineering Office
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Cal-owan River, Sta. 2 + 430 - Sta. 3 + 380 (Left Bank), Brgy. Ammacian to Brgy. Malagnat, Pinukpuk, Kalinga22PL0003Flood control | 100% | October 14, 2022 | January 5, 2023 | — | completedsumbong source |
| Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga23P00004Flood control | 100% | April 11, 2024 | June 21, 2024 | — | completedsumbong source |
| Construction of Mega Dike Project along Chico River, Sta. 84 + 000 - Sta. 85 + 000 (Left Bank), Tabuk City, Kalinga22PL0026 | 100% | January 30, 2023 | August 1, 2023 | — | completedsumbong source |
Rule Definition
Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.
Triggering Data & citations
Contractor holds a large share of flood-control contract value in its district/province
{
"hhi": 0.2163015983139886,
"scope": "deo",
"bucketKey": "deo:Lower Kalinga District Engineering Office",
"contractor": "JTM CONST / EGB CONST CORP FORMERLY: EGB CONST",
"thresholds": {
"share": 0.25,
"minContracts": 3,
"minBucketContracts": 10
},
"bucketTotalPhp": 660507123.95,
"contractorShare": 0.3796505992855612,
"contractorTotalPhp": 250761925.44,
"contractorContracts": 3
}Source documents
Possible Innocent Explanations
- This may be due to the contractor's strong track record or specialization in flood-control projects in the area.