Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23HK0062 was awarded at 100.00% of its ABC. Across its 19 recorded contracts, PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS was awarded at ≥99.5% of ABC 19 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor bid exactly at the ABC to maximize their chances of winning within the legal limit.

Public record entityRehabilitation of Ocoy River Control, Magatas, Sibulan, Negros Oriental
LocationSIBULAN (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VIIContract 23HK0062
Amount₱49,000,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Ocoy River Control, Magatas, Sibulan, Negros Oriental23HK0062Flood control100%October 14, 2023September 20, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 6, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Oriental 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 49000000,
  "threshold": 0.995,
  "contractId": "23HK0062",
  "contractor": "PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS",
  "contractCostPhp": 49000000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate