LOUREL DEVELOPMENT CORP FORMERLY :LOUREL D is listed as a company organization in Philippine public procurement records on this site, with 16 linked DPWH project(s) totaling about ₱1,502,383,456.25. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
LOUREL DEVELOPMENT CORP FORMERLY :LOUREL D
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 16
- Total value
- ₱1,502,383,456.25
- Published flags
- 0
- Region
- Region I · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for LOUREL DEVELOPMENT CORP FORMERLY :LOUREL D — not an accusation or finding of wrongdoing.
Score: 72.20 / 100 · Projects in sample: 16 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 10
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 16
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 16
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 16
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — weight redistributed
- projects
- 16
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — weight redistributed
- projects
- 16
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
16 geotagged project(s) — Open full map
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0579 + 225 - K0579 + 30023A00345 · ₱164,049,985.13 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0579 + 150 - K0579 + 22523A00344 · ₱164,045,000.51 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0585 + 900 - K0585 + 960, K0588 + 200 - K0588 + 26023A00346 · ₱154,397,805.13 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0577 + 465 - K0577 + 500, K0577 + 900 - K0577 + 915, K0588 + 700 - K0588 + 73023A00343 · ₱154,367,532.85 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ALTURA BATA - ALTURA MATAN23DC0141 · ₱96,499,936.70 · mapped
- Construction of Flood Mitigation Structures along San Juan River - Phase 4, Tanauan - Sto Tomas, Batangas23DC0094 · ₱96,499,879.00 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BAYTO RIVER, PHASE 7, SANTA CRUZ, ZAMBALES25CL0083 · ₱95,071,789.43 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BUGAAN RIVER - PHASE 3,23DC0077 · ₱94,087,500.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SULPOC - ALT23DC0076 · ₱94,044,423.70 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK (PHASE 1), SAN CLEMENTE, TARLA21CJ0141 · ₱93,508,136.27 · mapped
- CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK (PHASE 5), SAN CLEMENTE, TARLAC21CJ0153 · ₱93,507,932.04 · mapped
- CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK (PHASE 6), SAN CLEMENTE, TARLAC21CJ0154 · ₱93,502,661.07 · mapped
- Construction of Revetment along Lawaya River (Palahanan 2 Section), San Juan, Batangas23DD0149 · ₱49,000,000.00 · mapped
- ASPHALT OVERLAY @ CALAPAN SOUTH ROAD, K0171+000 - K0171+845, K0172+092 - K0172+700, K0173+000 - K0173+370, BULALACAO, ORIENTAL MINDORO17EI0066 · ₱27,899,335.96 · mapped
- ASPHALT OVERLAY @ CALAPAN SOUTH ROAD, K0118+000 - K0118+147, K0120+201 - K0121+000, K0126+417 - K0127+000, BONGABONG, ORIENTAL MINDORO17EI0065 · ₱23,307,893.26 · mapped
- ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG CONCEPCION - LA PAZ ROAD, CONCEPCION, TARLAC21CK0012 · ₱8,593,645.20 · mapped
