AA CONSTRUCTION is listed as a company organization in Philippine public procurement records on this site, with 15 linked DPWH project(s) totaling about ₱71,398,733.98. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
AA CONSTRUCTION
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 15
- Total value
- ₱71,398,733.98
- Published flags
- 0
- Region
- Zamboanga City 2nd DEO · Region IX
Public Record Grade
A transparent, data-derived summary of reported public records for AA CONSTRUCTION — not an accusation or finding of wrongdoing.
Score: 82.70 / 100 · Projects in sample: 15 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 83.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 83.3
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 10
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 15
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 15
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 15
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
15 geotagged projects — Open full map
- CONCRETING OF BRGY. TIMBABAUAN FMR, BRGY. TIMBABAUAN, TUNGAWAN ZAMBOANGA SIBUGAY24JF0062 · ₱10,390,384.58 · mapped
- CONSTRUCTION OF ROAD, BRGY. BOLONG, ZAMBOANGA CITY20JA0063 · ₱9,769,559.23 · mapped
- CONCRETING OF BUENAVISTA - MANTAHA FMR, BRGY. BUENAVISTA AND BRGY. MANTAHA, ZAMBOANGA CITY18JA0111 · ₱5,801,077.82 · mapped
- CONSTRUCTION OF CONCRETE ROAD AT RIVER SIDE ZONE III, BARANGAY CULIANAN, ZAMBOANGA CITY, ZAMBOANGA DEL SUR22JA0049 · ₱4,894,718.60 · mapped
- CONSTRUCTION OF TFZ MOTOR POOL (CAR PARK), CAMP ARTURO ENRILE, MALAGUTAY, ZAMBOANGA CITY, ZAMBOANGA DEL SUR21JA0108 · ₱4,893,143.23 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) WITH POTABLE WATER REFILLING STATION, BARANGAY CASACON, ROSELLER T. LIM, ZAMBOANGA SIBUGAY23JF0099 · ₱4,332,356.88 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING WITH POTABLE WATER REFILLING STATION, BARANGAY AGUINALDO, NAGA, ZAMBOANGA SIBUGAY23JF0101 · ₱4,330,338.95 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN TIAYON INTEGRATED SCHOOL, BARANGAY TIAYON, ZAMBOANGA SIBUGAY24JF0057 · ₱3,912,062.66 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BRGY. TAYTAY MANUBO, NAGA, ZAMBOANGA SIBUGAY25JF0041 · ₱3,884,681.48 · mapped
- REHABILITATION OF DAMAGED PAVED ROADS, BARANGAY CULIANAN, ZAMBOANGA CITY21JA0095 · ₱3,855,111.81 · mapped
- CONSTRUCTION OF COVERED COURT WITH POTABLE WATER REFILLING STATION, BARANGAY TAWAY, IPIL, ZAMBOANGA SIBUGAY23JF0098 · ₱3,826,373.28 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CAYAMCAM, TUNGAWAN, ZAMBOANGA SIBUGAY25JF0032 · ₱3,724,384.88 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CACAO, ZAMBOANGA CITY19JA0155 · ₱2,969,312.06 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) CABALUAY NATIONAL HIGH SCHOOL, ZAMBOANGA CITY19JA0131 · ₱2,857,290.95 · mapped
- LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF ROAD AT BRGY. BOLONG, ZAMBOANGA CITY18JA0068 · ₱1,957,937.57 · mapped
Across government
- DOH Goods & services: 29 awards · ₱19,085,335.80
- DOH Infrastructure: 2 awards · ₱2,616,037.14
- San Fernando Water District Infrastructure: 7 awards · ₱1,994,391.35
- Province of Pampanga Infrastructure: 1 award · ₱936,707.76
- City of Bayugan Goods & services: 1 award · ₱276,500.75
- Various Engineering and Calibration Equipment
- Various Engineering and Maintenance Supplies and E
- 1 1/4 PPR Union Patente Pn20 and other hardware su
- Supply and Delivery of Materials for Construction
- Materials for Genset Housing
- Adaptation Works for JBLMGH Extension at Sto. Toma
- adaptation works for jblmgh extention (masonry)
- Adaptation Works
- Adaptation Works
- Adaptation Works
- Various Engineering and Maintenance Supplies and E
- Various Engineering and Maintenance Supplies
- 9 watts bulb and other supplies
- Various Engineering and Maintenance Supplies and E
- Repiping and Relocation of Main Source
- Supply and Installation of Flush Doors
- Air conditioning compressor and other supplies
- GI Pipe and other construction materials
- PPR Pipe and other construction materials and supp
- Various Engineering and Maintenance Supplies
- cutting disk and other materials for the perimeter
- panel box 22 branches and other engineering suppli
- submersible pump
- Air conditioning supplies
- hardware supplies
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
