Buildings and Facilities23JF0099

CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) WITH POTABLE WATER REFILLING STATION, BARANGAY CASACON, ROSELLER T. LIM, ZAMBOANGA SIBUGAY

CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) WITH POTABLE WATER REFILLING STATION, BARANGAY CASACON, ROSELLER T. LIM, ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Zamboanga Sibugay 2nd DEO, Region IX. Reported contract value: ₱4,332,356.88. Status: Reported complete (DPWH). Contractor on record: AA CONSTRUCTION. Figures trace to dpwh.

Zamboanga Sibugay 2nd DEO, Region IX
Region: Region IX

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-23-0023800 · ₱6,342,353 · release to the district office, not itemized per project

    Possible match · score 0.56

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23JF0099 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-31 → 2016-01-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) WITH POTABLE WATER REFILLING STATION, BARANGAY CASACON, ROSELLER T. LIM, ZAMBOANGA SIBUGAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Sibuguey River, Barangay Villacastor, Buug, Zamboanga Sibugay Package 3
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-23-0023800

₱6,342,353.00 · FY2023

Released to 0000000 Central Bicol State - University of Agriculture (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱4,332,356.88

Progress

Reported complete (DPWH)

Start Date

March 4, 2024

Target End

July 1, 2024

5. Audit