RIVBROS CONST FACTORS is listed as a company organization in Philippine public procurement records on this site, with 120 linked DPWH project(s) totaling about ₱1,385,842,978.81. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
RIVBROS CONST FACTORS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 120
- Total value
- ₱1,385,842,978.81
- Published flags
- 0
- Region
- Pangasinan 3rd DEO · Region I
Public Record Grade
A transparent, data-derived summary of reported public records for RIVBROS CONST FACTORS — not an accusation or finding of wrongdoing.
Score: 78.30 / 100 · Projects in sample: 120 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 60.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 60.5
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 76
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 109
- pastTargetOngoingProjects
- 24
- undatedCompletedProjectsExcluded
- 9
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 120
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 120
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 120
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 120
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 111 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF FLOOD CONTROL ALONG VIRAY RIVER, BRGY. SAN MAXIMO-SAN MIGUEL, NATIVIDAD, PANGASINAN20AI0036 · ₱46,559,258.67 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG VIRAY RIVER, BRGY. POBLACION-EAST, CACANDONGAN, NATIVIDAD, PANGASINAN20AI0049 · ₱46,552,679.75 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TAGAMUSING RIVER, STA. 0+000 - STA. 0+304.00, BRGY. TULONG, URDANETA CITY, PANGASINAN22AI0072 · ₱43,875,133.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING ASINGAN, PANGASINAN24AI0186 · ₱37,596,983.62 · mapped
- CONCRETING OF ROADS, SAN NICOLAS, PANGASINAN24AI0094 · ₱29,516,136.73 · mapped
- CONSTRUCTION OF CARMAY EAST MULTI-PURPOSE BUILDING, ROSALES, PANGASINAN22AI0187 · ₱28,898,149.92 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CRISIS MANAGEMENT CENTER) BARANGAY CARMAY EAST, ROSALES, PANGASINAN25AI0138 · ₱28,808,245.10 · mapped
- ROAD WIDENING ALONG BINALONAN-ASINGAN-STA. MARIA ROAD (S00024LZ) KO 207+000 - KO 208+20019AI0030 · ₱28,072,462.71 · mapped
- CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN NATIVIDAD NATIONAL HIGH SCHOOL, BARANGAY POBLACION EAST, NATIVIDAD, PANGASINAN24AI0218 · ₱27,480,030.49 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 1) TAYUG, PANGASINAN24AI0175 · ₱24,378,693.19 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBAYAOAN RIVER, BRGY. FIANZA, SAN NICOLAS, PANGASINAN24AI0040 · ₱24,146,826.49 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ROSALES, PANGASINAN24AI0128 · ₱23,714,133.32 · mapped
- CONCRETING/ REHABILITATION OF ROADS, ASINGAN, PANGASINAN24AI0089 · ₱23,489,162.34 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), TAYUG, PANGASINAN23AI0155 · ₱19,726,519.30 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBAYAOAN RIVER, BRGY. FIANZA, SAN NICOLAS, PANGASINAN, PHASE II24AI0070 · ₱19,573,019.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MITURA RIVER BRGY SOBOL, ASINGAN, PANGASINAN (PHASE II)24AI0063 · ₱19,354,588.45 · mapped
- CONSTRUCTION OF ASINGAN-VILLASIS ROAD, ASINGAN, PANGASINAN24AI0125 · ₱19,274,658.38 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, TAYUG, PANGASINAN25A00268 · ₱19,210,415.82 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING BARANGAY POBLACION, SAN NICOLAS, PANGASINAN24AI0294 · ₱19,115,439.36 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGNO RIVER AND ALLIED RIVER, BRGY. SAMON, STA. MARIA, PANGASINAN20AI0050 · ₱18,621,225.97 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ASINGAN, PANGASINAN24AI0127 · ₱18,574,920.08 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, ASINGAN, PANGASINAN, PHASE 225AI0113 · ₱18,565,383.13
- CONCRETING OF ROADS, STA. MARIA, PANGASINAN24AI0090 · ₱18,047,192.68 · mapped
- CONSTRUCTION OF TWO STOREY SIX CLASSROOM SCHOOL BUILDING TOBOY ELEMENTARY SCHOOL, ASINGAN, PANGASINA18AI0341 · ₱17,989,384.38 · mapped
- CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING AT TAYUG, PANGASINAN23AI0195 · ₱17,357,148.15 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 1 NATIVIDAD, PANGASINAN24AI0179 · ₱17,196,023.17 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, BINALONAN-ASINGAN-STA. MARIA ROAD KO 194+312 - KO 195+02423AI0092 · ₱16,549,718.34 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, TAYUG, PANGASINAN19AI0233 · ₱16,331,065.89 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, SAN NICOLAS, PANGASINAN19AI0220 · ₱15,946,767.71 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT TAYUG, PANGASINAN23AI0156 · ₱15,792,039.51 · mapped
- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF ROADS AT TAYUG, PANGASINAN23AI0098 · ₱15,416,043.23 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ASINGAN, PANGASINAN21AI0122 · ₱14,941,055.68 · mapped
- CONCRETING OF BRGY. CAROSUCAN NORTE-BRGY. CAROSUCAN SUR FMR, BRGY. CAROSUCAN NORTE AND BRGY. CAROSUCAN SUR, ASINGAN, PANGASINAN24AI0153 · ₱14,905,077.15 · mapped
- CONCRETING OF BRGY. GONZALO - BRGY. CARAYACAN FMR, BRGY. GONZALO AND BRGY. CARAYACAN, SAN QUINTIN, PANGASINAN24AI0155 · ₱14,894,252.60 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, ROSALES, PANGASINAN24AI0144 · ₱14,820,188.19 · mapped
- CONCRETING OF BRGY. SAN ROQUE, SAN NICOLAS TO BRGY. BARANGOBONG, NATIVIDAD FMR, BRGY. SAN ROQUE, SAN NICOLAS AND BRGY. BARANGOBONG, NATIVIDAD, PANGASINAN24AI0156 · ₱14,738,209.74 · mapped
- CONCRETING OF SAN ROQUE, SAN NICOLAS - BARANGOBONG, NATIVIDAD FMR, BRGY. SAN ROQUE, SAN NICOLAS AND BRGY. BARANGOBONG, NATIVIDAD, PANGASINAN24AI0157 · ₱14,738,209.74 · mapped
- CONSTRUCTION OF ROAD, TAYUG, PANGASINAN24AI0056 · ₱14,668,596.68 · mapped
- CONSTRUCTION OF ROAD, SAN MANUEL, PANGASINAN, PHASE 225AI0102 · ₱14,656,552.45 · mapped
- ROAD WIDENING-SECONDARY ROADS, CARMEN JCT. - MANAT ROAD, KO 184+345 - KO 185+00023AI0044 · ₱14,521,173.39 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANGASINAN STATE UNIVERSITY, STA. MARIA, PANGASINAN20AI0152 · ₱14,417,364.06 · mapped
- CONSTRUCTION OF SABO DAM/CHECK DAM & EMBANKMENT PROTECTION AT DIPALO RIS, SAN QUINTIN, PANGASINAN25AI0184 · ₱14,259,000.64 · mapped
- CONSTRUCTION OF EMBANKMENT PROTECTION AT AGNO RIS, ASINGAN, PANGASINAN25AI0183 · ₱14,258,870.01 · mapped
- CONSTRUCTION OF TWO STOREY FOUR CLASSROOM SCHOOL BUILDING, CAMANGGAAN E/S, ROSALES, PANGASINAN18AI0358 · ₱13,438,105.92 · mapped
- CONCRETING OF STA. MARIA WEST-STA. MARIA EAST FMR, BRGY. STA. MARIA WEST AND BRGY. STA. MARIA EAST, SAN NICOLAS, PANGASINAN23AI0132 · ₱12,437,500.00 · mapped
- ROAD WIDENING - TERTIARY ROADS - BINALONAN-ASINGAN-STA. MARIA ROAD, KO 208+200 - KO 208+70021AI0045 · ₱12,328,724.24 · mapped
- CONSTRUCTIONREHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING, SAN NICOLAS, PANGASINAN21AI0129 · ₱12,127,381.81 · mapped
- CONCRETING OF BRGY. CARAYACAN TO BRGY. BUENAVISTA FMR, BRGY. CARAYACAN, SAN QUINTIN AND BRGY. BUENAVISTA, UMINGAN, PANGASINAN23AI0137 · ₱11,934,839.08 · mapped
- CONSTN OF TWO STRY FOUR CL SB (W/ MICROPILE) AT ARISTON BANTUG E/S, ASINGAN, PANGASINAN17AI0561 · ₱11,871,476.91
- CONCRETING OF ROAD, SAN NICOLAS, PANGASINAN19AI0168 · ₱11,817,768.12 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
