E B J R CONST is listed as a company organization in Philippine public procurement records on this site, with 26 linked DPWH project(s) totaling about ₱222,825,593.45. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
E B J R CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 26
- Total value
- ₱222,825,593.45
- Published flags
- 0
- Region
- Apayao 1st DEO · Cordillera Administrative Region
Public Record Grade
A transparent, data-derived summary of reported public records for E B J R CONST — not an accusation or finding of wrongdoing.
Score: 76.70 / 100 · Projects in sample: 26 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 63.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 63.2
- lateCompletedProjects
- 10
- onTimeCompletedProjects
- 7
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 18
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 26
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 26
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 26
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 26
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
21 geotagged projects — Open full map
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER,24PB0004 · ₱28,663,837.42 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, MANAG-TALIFUGO-PADDAOAN ROAD IN SUPPORT OF BANANA, COFFEE, CACAO, RICE AND CORN INDUSTRIES, CONNER, APAYAO21PB0005 · ₱19,359,489.09 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS,CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING, BRGY. CAGLAYAN (NEW POB.),CONNER, APAYAO19PB0007 · ₱18,981,745.73 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS,MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER, APAYAO19PB0011 · ₱17,088,467.97 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER, APAYAO25PB0017 · ₱14,223,713.16 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF NABUANGAN (UPSTREAM) FLOOD CONTROL, BRGY. CUPIS, CONNER, APAYAO19PB0018 · ₱13,782,174.91 · mapped
- PACKAGE VIII. 1.) CONSTRUCTION OF STA. FILOMENA SCHOOL OF ARTS AND TRADE 2 CL WORKSHOP BUILDING 2.) CONSTRUCTION OF STA. FILOMENA SCHOOL OF ARTS AND TRADE 1 CL WORKSHOP BUILDING 3.) ONSTRUCTION OF STA. FILOMENA SCHOOL OF ARTS AND TRADE 1 STOREY 2CL17PC0104 · ₱12,667,953.68
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF BARREN RIVER FLOOD CONTROL25PB0014 · ₱11,226,367.70 · mapped
- ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, ABBUT-CONNER RD - K0558+022 - K0558+156 CONNER, APAYAO22PB0012 · ₱10,290,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP), BIP-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF CONNER EDUCATION DISTRICT MULTIPURPOSE BUILDING, BARANGAY BULUAN, CONNER, APAYAO24PB0027 · ₱9,594,800.30 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP), MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER,APAYAO23PB0003 · ₱9,499,173.64 · mapped
- CONCRETING OF STA. FILOMENA-SINIGPIT FMR, BRGY STA. FILOMENA, CALANASAN, APAYAO16PC0023 · ₱6,746,586.52
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, ABBUT-CONNER RD-K0553+853-K0553+890,K0555+915-K0555+940,K0558+800-K0558+84125PB0026 · ₱6,263,805.64 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BADDUAT, KABUGAO, APAYAO21PB0018 · ₱4,797,017.19 · mapped
- ORAGNIZATIONAL OUTCOME1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NERTWORK DEVELOPMENT PROGRAM- OFF-CARRIAGEWAY IMPROVEMENT- TERTIARY ROADS APAYAO-ILOCOS NORTE RD- K0608+824-K0609+11224PB0033 · ₱4,756,107.89 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0604+313 - K0604+331, K0590+220 - 590+30223PB0016 · ₱4,750,004.65 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ABBUT-CONNER RD - K0552+595 - K0552+88024PB0038 · ₱4,715,762.41 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CONNER- KABUGAO RD. - K0603+115-K0603+14525PB0015 · ₱4,714,092.59 · mapped
- CONCRETING OF SALAGUNTING-CADACLAN FMR, CALANASAN, APAYAO16PC0035 · ₱3,835,001.11
- CONCRETING OF SABANGAN-MALUNGOG-DON ROQUE FMR, CALANASAN,APAYAO16PC0036 · ₱2,921,776.07
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, CONNER-KABUGAO RD - K0602+766 - K0603+11923PB0019 · ₱2,715,220.70 · mapped
- CONSTRUCTION OF CAGLAYAN MPB (KALIPI), CONNER, APAYAO19PB0037 · ₱2,628,019.29 · mapped
- CONCRETING OF CALAFUG-LIPAY-MASICU FMR, BRGY. CALAFUG-LIPAY-MASICU, CONNER, APAYAO16PB0028 · ₱2,456,789.30
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, CONNER-KABUGAO RD - K0605+030 - K0605+18523PB0020 · ₱2,208,896.33 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CONNER-KABUGAO RD - K0588+691 - K0588+83723PB0021 · ₱2,078,534.66 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SLOPE PROTECTION, MANAG BRGY. HALL, MANAG, CONNER, APAYAO18PB0020 · ₱1,860,255.50 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
