Roads16PC0023No coordinates published by DPWH

CONCRETING OF STA. FILOMENA-SINIGPIT FMR, BRGY STA. FILOMENA, CALANASAN, APAYAO

CONCRETING OF STA. FILOMENA-SINIGPIT FMR, BRGY STA. FILOMENA, CALANASAN, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱6,746,586.52. Status: Reported complete (DPWH). Contractor on record: E B J R CONST. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱38,750 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-16-0037636 · ₱95,000 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16PC0023 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-02-24 → 2022-09-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF STA. FILOMENA-SINIGPIT FMR, BRGY STA. FILOMENA, CALANASAN, APAYAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱38,750,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Nabuangan Flood Control Nabuangan, Apayao Lone District
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-16-0037636

₱95,000.00 · FY2016

Released to Technological University of the Philippines - Manil (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

26 projects · ₱222.8M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER,

Apayao 1st DEO, Cordillera Administrative Region

2024₱28.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, MANAG-TALIFUGO-PADDAOAN ROAD IN SUPPORT OF BANANA, COFFEE, CACAO, RICE AND CORN INDUSTRIES, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2021₱19.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS,CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING, BRGY. CAGLAYAN (NEW POB.),CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2019₱19.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS,MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2019₱17.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2025₱14.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF NABUANGAN (UPSTREAM) FLOOD CONTROL, BRGY. CUPIS, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2019₱13.8M
Reported complete (DPWH)
View all 26 projects →

4. Implementation

Contract Amount

₱6,746,586.52

Progress

Reported complete (DPWH)

Start Date

August 30, 2016

Target End

March 9, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoCalanasan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.