J E L CONST is listed as a company organization in Philippine public procurement records on this site, with 18 linked DPWH project(s) totaling about ₱272,912,740.26. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
J E L CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 18
- Total value
- ₱272,912,740.26
- Published flags
- 0
- Region
- Nueva Vizcaya DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for J E L CONST — not an accusation or finding of wrongdoing.
Score: 72.30 / 100 · Projects in sample: 18 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 10
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 18
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 18
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 18
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 18
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 18
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
18 geotagged projects — Open full map
- REPAIR/REHABILITATION OF BARAT RIVER CONTROL ALONG STA. CRUZ RIVER, BARAT SECTION, BAMBANG, NUEVA VIZCAYA18BI0119 · ₱27,324,204.07 · mapped
- REPAIR/REHABILITATION OF BUENAVISTA RIVER CONTROL ALONG MAGAT RIVER, BUENAVISTA SECTION, BAYOMBONG, NUEVA VIZCAYA18BI0120 · ₱27,310,954.91 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 2), BARANGAY BAHAY TORO, QUEZON CITY25OF0073 · ₱24,502,261.91 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROAD-PAPAYA-MALABING- WANGAL-BINUGAWAN-TADJI-RUNRUNO RD., K0312+065-K0312+10022BI0022 · ₱24,500,000.00 · mapped
- ORGANIZATION OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-NSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DR19BI0055 · ₱19,600,000.00 · mapped
- CONCRETING OF PANINAAN-MALILITAO FMR, BACARRA, ILOCOS NORTE24AA0424 · ₱19,302,995.92 · mapped
- REPAIR/MAINTENANCE OF ERODED ROSARIO BRIDGE NO. 2 APPROACHES AND BANK PROTECTION, NAMAMPARAN, DIADI, NUEVA VIZCAYA24BI0174 · ₱19,300,000.00 · mapped
- CONCRETING OF BRGY. LAGANDIT FMR, BRGY. LAGANDIT, PIDDIG, ILOCOS NORTE24AA0458 · ₱19,208,418.73 · mapped
- CONCRETING OF PASIOCAN-SANGIL FMR BACARRA, ILOCOS NORTE24AA0422 · ₱19,099,658.68 · mapped
- REPAIR/REHABILITATION (CONCRETE REBLOCKING) ALONG DAANG MAHARLIKA K 209+(-896) - K 210+000, TACTAC SECTION STA. FE, NUEVA VIZCAYA21BJ0042 · ₱18,512,526.56 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. CRUZ RIVER CONTROL, BARAT SECTION (PHASE 3), BAMBAN18BI0053 · ₱14,140,261.03 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER BASIN - CONSTRUCTION OF MAGAT RIVER CONTROL, CABARROGUIS SECTION (STA. 0+000 - STA. 0+276), BAYOMBONG, NUEVA VIZCAYA17BI0049 · ₱13,891,267.55 · mapped
- BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING, (DAY CARE CENTER) BARANGAY 02 ANAO, PIDDIG, ILOCOS NORTE24AA0389 · ₱4,841,596.04 · mapped
- CONCRETING OF SAN ANTONIO-BRGY. DULLAO FRM, BRGY. DULLAO, BAMBANG, NUEVA VIZCAYA18BI0091 · ₱4,796,847.52 · mapped
- CONSTRUCTION OF MAGAT RIVER CONTROL, VISTA ALEGRE SECTION (PHASE 3) BAYOMBONG, NUEVA VIZCAYA17BI0026 · ₱4,702,429.93 · mapped
- CONSTRUCTION OF MAGAT RIVER CONTROL, BUENAVISTA SECTION, BAYOMBONG, NUEVA VIZCAYA17BI0027 · ₱4,702,279.93 · mapped
- CONSTRUCTION OF MAGAT RIVER CONTROL, MAGAPUY SECTION (PHASE 2), BAYOMBONG, NUEVA VIZCAYA17BI0028 · ₱4,702,037.48 · mapped
- LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (ALUMNI BUILDING) NVSU BAMBANG CAMPUS19BI0028 · ₱2,475,000.00 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
