Construction of Flood Mitigation Structure23N00114

Construction of Flood Mitigation Structure along Tagabaka Creek, Downstream with RCBC Improvement, Butuan City, Agusan del Norte

Construction of Flood Mitigation Structure along Tagabaka Creek, Downstream with RCBC Improvement, Butuan City, Agusan del Norte is a DPWH-tracked public work in BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE, Region XIII. Reported contract value: ₱173,699,926.00. Status: Reported complete (DPWH). Contractor on record: ME 3 CONST / EQUI-PARCO CONST CO. Figures trace to sumbong.

BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-23-0027183 · ₱1,300,000 · release to the district office, not itemized per project

    Possible match · score 0.56

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23N00114 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-06-15 → 2025-03-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Agusan del Norte

Based on the coordinates published with the DPWH record and NOAH file AgusanDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Mitigation Structure along Tagabaka Creek, Downstream with RCBC Improvement, Butuan City, Agusan del Norte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures of Agusan River Basin (Bit-os Section) Package 4, Butuan City
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-23-0027183

₱1,300,000.00 · FY2023

Released to Central Luzon State University (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

6 projects · ₱1.4B total · 0 flags

4. Implementation

Contract Amount

₱173,699,926.00

Progress

Reported complete (DPWH)

Start Date

May 18, 2023

Target End

June 25, 2024

5. Audit