CONSTRUCTION OF FLOOD CONTROL DOWNSTREAM OF WATERFALL BRIDGE 2, BRGY. WATERFALL, BALINGASAG, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL DOWNSTREAM OF WATERFALL BRIDGE 2, BRGY. WATERFALL, BALINGASAG, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱19,794,776.49. Status: Reported complete (DPWH). Contractor on record: ONE NINE ONE TRADING. Figures trace to dpwh.
Total Contract Cost
