CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LINUGOS RIVER (UPSTREAM KIBUNGSOD BRIDGE, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LINUGOS RIVER (UPSTREAM KIBUNGSOD BRIDGE, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱9,309,617.44. Status: Reported complete (DPWH). Contractor on record: ONE NINE ONE TRADING. Figures trace to dpwh.
Total Contract Cost

