Flood Control and Drainage19IA0125

REPAIR/REHABILITATION OF FLOOD CONTROL IN BUWAON RIVER, BRGY. BUNGA

REPAIR/REHABILITATION OF FLOOD CONTROL IN BUWAON RIVER, BRGY. BUNGA is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱39,965,850.00. Status: Reported complete (DPWH). Contractor on record: B C CUERPO CONST CORP. Figures trace to dpwh.

Biliran DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-BMB-D-19-0021677 · ₱42,041,886 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19IA0125 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-18 → 2025-03-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Biliran

Based on the coordinates published with the DPWH record and NOAH file Biliran.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR/REHABILITATION OF FLOOD CONTROL IN BUWAON RIVER, BRGY. BUNGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-19-0021677

₱42,041,886.00 · FY2019

Released to General Headquarters - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

56 projects · ₱3.7B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES, CONSTRUCTION OF PCOO VISAYAS HUB BUILDING IN BARANGAY SUBANGDAKU, MANDAUE CITY

Region VII, Region VII

2022₱289.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS DARAGA, ALBAY DIVERSION ROAD, ALBAY, DARAGA, ALBAY PROVINCE

Region V, Region V

2018₱217.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO(2) TO SIX (6) LANES INCL DRAINAGE STRUCTRES AND OTHER ANCILLARY WORKS K0110+400-K0110+740; K0111+300-K0111+439; K0111+455-K0111+677; K0111+693-K0113+714; K0113+736-K0113+770, NARRA, PALAWAN

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

ROAD OPENING/CONCRETING OF CONCEPTION - TAPUL - NAWL - PAGSANGHAN - ANAGASE - STO. NIÑO - MAYDOLOBE - SARAO CANVALS - CARANAS ROAD, PARANAS - MOTIONG SAMAR (PHASE I), SAMAR 2ND LD

Region VIII, Region VIII

2020₱143.9M
Past target date (DPWH On-Going)
No sat.

ROAD OPENING/CONCRETING OF CONCEPTION - TAPUL - NAWL - PAGSANGHAN - ANAGASE - STO. NIÑO - MAYLOBE - SARAO CANVAIS - CARANAS ROAD, PARANAS - MOTIONG, SAMAR (PHASE II), SAMAR 2ND LD

Region VIII, Region VIII

2020₱143.9M
Past target date (DPWH On-Going)
No sat.

ROAD WIDENING - BILIRAN CIRCUMFERENTIAL ROAD, K1008+360-K1010+490, K1011+480-K1011+690, K1011+740-K1012+093,K1012+134-K1013+490 (11.4738, 124.4695-11.4788, 124.5436, 11.4862, 124.4503-11.4878, 124.4495, 11.4882, 124.4494-11.4912,..,PROVINCE OF BILIRAN

Biliran DEO, Region VIII

2018₱139.6M
Reported complete (DPWH)
View all 56 projects →

4. Implementation

Contract Amount

₱39,965,850.00

Progress

Reported complete (DPWH)

Start Date

March 27, 2020

Target End

September 17, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.