Roads18IA0062

ROAD WIDENING - BILIRAN CIRCUMFERENTIAL ROAD, K1008+360-K1010+490, K1011+480-K1011+690, K1011+740-K1012+093,K1012+134-K1013+490 (11.4738, 124.4695-11.4788, 124.5436, 11.4862, 124.4503-11.4878, 124.4495, 11.4882, 124.4494-11.4912,..,PROVINCE OF BILIRAN

ROAD WIDENING - BILIRAN CIRCUMFERENTIAL ROAD, K1008+360-K1010+490, K1011+480-K1011+690, K1011+740-K1012+093,K1012+134-K1013+490 (11.4738, 124.4695-11.4788, 124.5436, 11.4862, 124.4503-11.4878, 124.4495, 11.4882, 124.4494-11.4912,..,PROVINCE OF BILIRAN is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱139,566,069.70. Status: Reported complete (DPWH). Contractor on record: B C CUERPO CONST CORP. Figures trace to dpwh.

Biliran DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-18-0024228 · ₱11,034,798 · release to the district office, not itemized per project

    Possible match · score 0.73

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18IA0062 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-03-28 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱34,469,269 per km= 1.0x the Region VIII median (n=337)

Contract cost ₱139,566,070 ÷ 4.049 km read from the DPWH title (“K1008+360-K1010+490; K1011+480-K1011+690; K1011+740-K1012+093; K1012+134-K1013+490”; K-post / station range length). National percentile: 53. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING - BILIRAN CIRCUMFERENTIAL ROAD, K1008+360-K1010+490, K1011+480-K1011+690, K1011+740-K1012+093,K1012+134-K1013+490 (11.4738, 124.4695-11.4788, 124.5436, 11.4862, 124.4503-11.4878, 124.4495, 11.4882, 124.4494-11.4912,..,PROVINCE OF BILIRAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Extension of Busali Flood Control along Biliran Circumferential Road, Phase 2, Biliran, Biliran
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-18-0024228

₱11,034,798.00 · FY2018

Released to Regional Office - III (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

56 projects · ₱3.7B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES, CONSTRUCTION OF PCOO VISAYAS HUB BUILDING IN BARANGAY SUBANGDAKU, MANDAUE CITY

Region VII, Region VII

2022₱289.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS DARAGA, ALBAY DIVERSION ROAD, ALBAY, DARAGA, ALBAY PROVINCE

Region V, Region V

2018₱217.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO(2) TO SIX (6) LANES INCL DRAINAGE STRUCTRES AND OTHER ANCILLARY WORKS K0110+400-K0110+740; K0111+300-K0111+439; K0111+455-K0111+677; K0111+693-K0113+714; K0113+736-K0113+770, NARRA, PALAWAN

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

ROAD OPENING/CONCRETING OF CONCEPTION - TAPUL - NAWL - PAGSANGHAN - ANAGASE - STO. NIÑO - MAYDOLOBE - SARAO CANVALS - CARANAS ROAD, PARANAS - MOTIONG SAMAR (PHASE I), SAMAR 2ND LD

Region VIII, Region VIII

2020₱143.9M
Past target date (DPWH On-Going)
No sat.

ROAD OPENING/CONCRETING OF CONCEPTION - TAPUL - NAWL - PAGSANGHAN - ANAGASE - STO. NIÑO - MAYLOBE - SARAO CANVAIS - CARANAS ROAD, PARANAS - MOTIONG, SAMAR (PHASE II), SAMAR 2ND LD

Region VIII, Region VIII

2020₱143.9M
Past target date (DPWH On-Going)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES & OTHER ANCILLARY WORKS, KO104+388-KO105+742; KO105+771-KO106+922, NARRA, PALAWAN

Region IV-B, Region IV-B

2018₱135.1M
Reported complete (DPWH)
View all 56 projects →

4. Implementation

Contract Amount

₱139,566,069.70

Progress

Reported complete (DPWH)

Start Date

June 3, 2018

Target End

August 26, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)BiliranBiliranBurabod
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.