Flood Control and Drainage21CM0017

FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 8+593.60-STA. 8+993.20 (LEFT SIDE), OLONGAPO CITY

FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 8+593.60-STA. 8+993.20 (LEFT SIDE), OLONGAPO CITY is a DPWH-tracked public work in Zambales 2nd DEO, Region III. Reported contract value: ₱75,611,185.07. Status: Reported complete (DPWH). Contractor on record: ORANI CONST AND SUPPLY CORP FORMERLY:ORANI BUILDERS. Figures trace to dpwh.

Zambales 2nd DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱1,899 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱407,327,000 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱75,611,185 · ORANI CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-10-27 → 2019-10-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Zambales

Based on the coordinates published with the DPWH record and NOAH file Zambales.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 8+593.60-STA. 8+993.20 (LEFT SIDE), OLONGAPO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱1,899,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Malabon-Malimanga-Sinabacan Flood Control Phase III, Candelaria, Zambales
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱407,327,000.00 · FY2021

Released to Batangas 2nd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21CM0017 - Rehab. of FMS Sta. Rita River

₱75,611,185.07 · ORANI CONSTRUCTION AND SUPPLY

Award / contract ref: 21CM0017

4. Implementation

Contract Amount

₱75,611,185.07

Progress

Reported complete (DPWH)

Start Date

February 17, 2021

Target End

September 14, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.