Roads19HD0031

CONSTRUCTION/IMPROVEMENT OF ACCESS RAODS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO GUIWANON SPRING, BARANGAY TAPUL, TABOGON, CEBU

CONSTRUCTION/IMPROVEMENT OF ACCESS RAODS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO GUIWANON SPRING, BARANGAY TAPUL, TABOGON, CEBU is a DPWH-tracked public work in Cebu 4th DEO, Region VII. Reported contract value: ₱19,600,000.00. Status: Reported complete (DPWH). Contractor on record: VSP STRUCTURE VENTURES CORP FORMERLY: VIRLO CONST. Figures trace to dpwh.

Cebu 4th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROX-19-0007996 · ₱11,641,000 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19HD0031 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-11-28 → 2024-10-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF ACCESS RAODS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO GUIWANON SPRING, BARANGAY TAPUL, TABOGON, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROX-19-0007996

₱11,641,000.00 · FY2019

Released to Batangas 4th District Engineering Offi Division of El Salvador City (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

138 projects · ₱3.5B total · 4 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU

Region VII, Region VII

2025₱154.3M
Past target date (DPWH On-Going)
No sat.

OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (DOWNSTREAM), LILOAN, CEBU

Cebu 5th DEO, Region VII

2025₱144.7M
Past target date (DPWH On-Going)

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU

Cebu 5th DEO, Region VII

2024₱140.2M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION RIVERBANK FACILITIES ALONG CANSAGA RIVER, PACKAGE I, GARING, CONSOLACION, CEBU

Cebu 6th DEO, Region VII

2025₱135.0M
Past target date (DPWH On-Going)

Construction of Flood Control Structure along Bagatayam River, Sogod, Cebu

SOGOD (CEBU), CEBU, Region VII

2023₱106.1M
Reported complete (DPWH)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY JUBAY, LILOAN, CEBU

Cebu 5th DEO, Region VII

2025₱99.0M
Past target date (DPWH On-Going)
View all 138 projects →

4. Implementation

Contract Amount

₱19,600,000.00

Progress

Reported complete (DPWH)

Start Date

June 25, 2019

Target End

December 4, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.