Flood Control and Drainage25DN0062

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG 4K ROAD, BARANGAY SAN LUIS, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG 4K ROAD, BARANGAY SAN LUIS, ANTIPOLO CITY, RIZAL (SECOND DISTRICT) is a DPWH-tracked public work in Rizal 1st DEO, Region IV-A. Reported contract value: ₱5,702,348.05. Status: Past target date (DPWH On-Going). Contractor on record: H FRANCISCO CONST AND SUPPLY. Figures trace to dpwh.

Rizal 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-D-25-0016891 · ₱1,680,345 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱5,702,348 · H FRANCISCO CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    0% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Rizal

Based on the coordinates published with the DPWH record and NOAH file Rizal.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG 4K ROAD, BARANGAY SAN LUIS, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay San Roque, Antipolo City, Rizal
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-D-25-0016891

₱1,680,345.00 · FY2025

Released to Regional Office - VIII (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25DN0062

₱5,702,348.05 · H FRANCISCO CONSTRUCTION & SUPPLY

Contractor

F

24 projects · ₱289.5M total · 0 flags

4. Implementation

Contract Amount

₱5,702,348.05

Progress

Past target date (DPWH On-Going)

Start Date

May 26, 2025

Target End

September 22, 2025

5. Audit