CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL PROJECT, BAROTAC VIEJO RIVER CONTROL, BARANGAY NATIVIDAD, BAROTAC VIEJO, ILOILO, STA. 3+514.10 - STA 2+839.07, BAROTAC VIEJO, ILOILO
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL PROJECT, BAROTAC VIEJO RIVER CONTROL, BARANGAY NATIVIDAD, BAROTAC VIEJO, ILOILO, STA. 3+514.10 - STA 2+839.07, BAROTAC VIEJO, ILOILO is a DPWH-tracked public work in Iloilo 3rd DEO, Region VI. Reported contract value: ₱71,275,865.00. Status: Reported complete (DPWH). Contractor on record: UNITEC BUILDER INC. Figures trace to dpwh.
Total Contract Cost
