UNITEC BUILDER INC is listed as a company organization in Philippine public procurement records on this site, with 55 linked DPWH project(s) totaling about ₱3,466,141,569.80. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
UNITEC BUILDER INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 55
- Total value
- ₱3,466,141,569.80
- Published flags
- 2
- Region
- Region IX · Region VI
Online presence
Google Maps: Unitec Builder, Inc.★ 5 (2 reviews)Google Maps, 2026-10-22
596 Villa, Zamboanga City, Zamboanga del Sur
Licensed officers (PCAB)
- Benjamin M. Quidilla · Authorized Managing Officer (PCAB license 04803) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for UNITEC BUILDER INC — not an accusation or finding of wrongdoing.
Score: 72.30 / 100 · Projects in sample: 55 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 21
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 51
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 83.6/100 · Weight: 21%
- totalProjects
- 55
- componentScore
- 83.6
- terminatedProjects
- 3
- terminationRatePct
- 5.5
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 53
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.9/100 · Weight: 11%
- projects
- 55
- componentScore
- 98.9
- flagsPerProject
- 0.04
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 55
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 49 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (UPSTREAM - LEFT SIDE25J00012 · ₱144,993,765.48 · mapped
- CONSTRUCTION OF BY- PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD,(WEST COAST SECTION), ZAMBOANGA CITY20J00157 · ₱141,807,040.92 · mapped
- CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 424J00037 · ₱138,657,084.06 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUMAGA SECTION), ZAMBOANGA CITY24JA0014 · ₱130,863,256.23 · mapped
- ROAD UPGRADING (GRAVEL TO PAVED) OF ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), ZAMBOANGA DEL NORTE, 2ND DEO, K 1996 + 500.00 - K 1998 + 270.00, L = 1,770.00 LN.M. K 2002 + 855.00 - K 2003 + 415.00, L = 560.00 LN.M. CHAINAGE 0 - CHAINAGE 940.0017J00008 · ₱129,329,935.30 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE21J00028 · ₱121,481,166.52 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE20J00029 · ₱114,620,115.49 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE23J00028 · ₱105,084,341.12 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE18J00044 · ₱101,222,813.91 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF ZAMBOANGA WEST COASTAL ROAD (ZDN 2ND DEO) K1994+770 TO K1995+520, K1996+060 TO K1996+500.00 (NET LENGTH = 1,190.00 LN.M.)16J00006 · ₱99,570,108.71
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE, ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE20J00030 · ₱99,233,734.03 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE (UPSTREAM) PACKAGE 121J00026 · ₱99,045,916.42 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS & DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, WIDENING OF TULUNGATUNG BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY22J00074 · ₱98,815,759.48 · mapped
- CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 1, ZAMBOANGA CITY24JA0167 · ₱96,427,569.35 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE22J00015 · ₱94,945,624.70 · mapped
- CONSTRUCTION OF CONCRETE ROAD-KALIBO CIRCUMFERENTIAL ROAD, PACKAGE 2, AKLAN20G00055 · ₱94,923,475.48 · mapped
- CONSTRUCTION OF LABASON RIVER CONTROL, POBLACION LABASON ZAMBOANGA DEL NORTE 3RD LD, RIGHT SIDE: BEG. OF PROJECT 0 + 000.00 END OF PROJECT 0 + 884.40 (572.88), EXCEPTION: 0 + 441.32 - 0 + 752.84, LEFT SIDE: BEG. OF PROJECT 0 + 540.00 END OF PROJECT 0 + 8717J00039 · ₱94,317,194.62 · mapped
- CONSTRUCTION OF GRAVEL ROAD - KALIBO CIRCUMFERENTIAL ROAD, AKLAN19G00001 · ₱92,464,999.74 · mapped
- ACCESS ROAD- MANIKA CROSSING TO SITIO MAYNIYOG IN SUPPORT OF FOOD PROCESSING AGRIBUSINESS INDUSTRY, LIBACAO, AKLAN20GA0021 · ₱79,095,451.71 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF CADIO FLOOD CONTROL ALONG PANAY RIVER, CAPIZ21GD0077 · ₱77,199,987.78 · mapped
- NUMANCIA-LEZO PROVINCIAL ROAD NGR IN SUPPORT OF POTTERY MAKING & FOOD PROCESSING INDUSTRIES,LEZO,AKLAN18GA0062 · ₱74,452,979.93 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL PROJECT, BAROTAC VIEJO RIVER CONTROL, BARANGAY NATIVIDAD, BAROTAC VIEJO, ILOILO, STA. 3+514.10 - STA 2+839.07, BAROTAC VIEJO, ILOILO21GH0015 · ₱71,275,865.00 · mapped
- CONST. OF TANGALAN BYPASS ROAD, INCL. ROW AND BRIDGE, TANGALAN, AKLAN18GA0104 · ₱71,090,430.94 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO CITY FLOODWAY, JARO, ILOILO CITY20GJ0106 · ₱67,548,078.49 · mapped
- MAAYON BY-PASS ROAD INCLUDING BRIDGE, CAPIZ17GD0032 · ₱67,546,900.00
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SIOCON-SIRAWAI RD (S01147MN), K2088+875 - K2089+043, K2093+095 - K2093+15523JJ0044 · ₱61,760,000.00 · mapped
- CONSTRUCTION OF REVETMENT AT SIBALOM RIVER ALONG ILOILO-ANTIQUE ROAD, SIBALOM, ANTIQUE18GB0012 · ₱59,263,888.98 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CHANNELIZATION OF PUTIK RIVER WITH MAJOR TRAINING WORKS, ZAMBOANGA CITY19J00020 · ₱57,957,493.91 · mapped
- CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BRGY. POBLACION ILAWOD, BAROTAC VIEJO, ILOILO18GH0034 · ₱50,416,442.89 · mapped
- CONSTRUCTION OF REVETMENT - CONSTRUCTION OF REVETMENT WALL AT DUNGON CREEK SECTION 3 (BRGY. DUNGON A, JARO - BRGY. DUNGON B), ILOILO CITY20GJ0058 · ₱49,974,455.00 · mapped
- Construction of Revetment Wall along Aklan River, Brgy. Palale, Banga, Aklan22GA0120 · ₱49,954,779.27 · mapped
- CONSTRUCTION OF JCT.NATIONAL ROAD-BARANGAY SAN RAFAEL-LUMPATAN-LAPAK-SUMARAY-WALKER-PANPANAN 1-PANPA22GB0042 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF A NEW LEGISLATIVE BUILDING, SAN JOSE, ANTIQUE17GB0177 · ₱48,458,488.33
- CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION,STA. 000+236.00-STA. 000+390.00 AT BARANGAY SAN JOSE, ALONG BINALBAGAN-ISABELA ROAD, BINALBAGAN, NEGROS OCCIDENTAL17RC0045 · ₱46,204,552.53
- CONSTRUCTION OF REVETMENT AT PALIWAN RIVER ALONG ILOILO-ANTIQUE ROAD, ANTIQUE18GB0035 · ₱43,082,069.45 · mapped
- ROAD CONCRETING: BRGY. LUMBOYAN-BRGY. MABLAD ROAD CONNECTING TO ILOILO-ANTIQUE ROAD AND PUBLIC MARKET OF BARBAZA IN SUPPORT OF ABACA INDUSTRY18GB0098 · ₱43,029,221.68 · mapped
- CONSTRUCTION OF REVETMENT AT DALANAS RIVER AT CAPOYUAN, BARBAZA, ANTIQUE18GB0033 · ₱37,827,531.16 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD - K2135 + 871 - K2135 + 907, K2136 + 316 - K2136 + 35825JJ0011 · ₱34,674,389.73 · mapped
- CONSTRUCTION/IMPROVEMENT OF LEGISLATIVE BUILDING, ANTIQUE19GB0275 · ₱34,255,193.37 · mapped
- WIDENING OF ALTAVAS BRIDGE (B00290PN) ALONG AKLAN EAST ROAD AKLAN EAST ROAD21GA0015 · ₱33,994,053.38 · mapped
- BALETE BYPASS ROAD, AKLAN, BALETE, AKLAN22GA0011 · ₱33,784,810.22 · mapped
- WIDENING OF BRIDGE-VENTURANZA BRIDGE (B00282PN) ALONG AKLAN EAST RD. INCL. ROW, BANGA, AKLAN18GA0101 · ₱31,629,390.83 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO CITY FLOODWAY, JARO, ILOILO CITY20GJ0105 · ₱27,940,701.32 · mapped
- Construction of Flood Mitigation Structure, Brgy. Tulungatung, Zamboanga City, Zamboanga del Sur23JA0057 · ₱26,485,720.03 · mapped
- CONSTRUCTION OF 2 UNITS 2STY8CL SARA NHS, SARA, ILOILO16GH0100 · ₱23,001,352.40
- ROAD CONCRETING: BANAGO-TUNGO ROAD LEADING TO CALUYA PORT18GB0109 · ₱19,392,654.92 · mapped
- WIDENING OF BRIDGE-LAPGUPAN BR. 2 (B00229PN) ALONG ILOILO - CAPIZ RD. (NEW ROUTE)17GP0037 · ₱18,866,324.53 · mapped
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATL RDS,BUK-DAVAO CITY RD,K1575+387-K1577+00015K00123 · ₱18,294,140.88 · mapped
- CONSTRUCTION OF 3 STOREY 12 CLASSROOM SCHOOL BUILDING AT PUTIK CENTRAL SCHOOL16JA0127 · ₱18,235,831.78 · mapped
- CONSTRUCTION OF ONE (1) UNIT THREE (3) STOREY NINE (9) CLASSROOMS, JANIUAY NATIONAL COMPREHENSIVE HIGH SCHOOL, BRGY. DAMO-ONG, JANIUAY, ILOILO16GG0150 · ₱14,557,654.56
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
