Flood Control and Drainage17RC0045No coordinates published by DPWH

CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION,STA. 000+236.00-STA. 000+390.00 AT BARANGAY SAN JOSE, ALONG BINALBAGAN-ISABELA ROAD, BINALBAGAN, NEGROS OCCIDENTAL

CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION,STA. 000+236.00-STA. 000+390.00 AT BARANGAY SAN JOSE, ALONG BINALBAGAN-ISABELA ROAD, BINALBAGAN, NEGROS OCCIDENTAL is a DPWH-tracked public work in Negros Occidental 2nd DEO, Negros Island Region. Reported contract value: ₱46,204,552.53. Status: Reported complete (DPWH). Contractor on record: UNITEC BUILDER INC. Figures trace to dpwh.

Negros Occidental 2nd DEO, Negros Island Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Negros Island Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱30,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0015657 · ₱32,557 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17RC0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION,STA. 000+236.00-STA. 000+390.00 AT BARANGAY SAN JOSE, ALONG BINALBAGAN-ISABELA ROAD, BINALBAGAN, NEGROS OCCIDENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure and Slope Protection of Minulu-an River along Bacolod North Road, Talisay City, Negros Occidental
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0015657

₱32,557.00 · FY2017

Released to Tagakpan National Mo High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

55 projects · ₱3.5B total · 2 flags

Other projects by this contractor

No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (UPSTREAM - LEFT SIDE

Region IX, Region IX

2025₱145.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF BY- PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD,(WEST COAST SECTION), ZAMBOANGA CITY

Region IX, Region IX

2020₱141.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 4

Region IX, Region IX

2024₱138.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUMAGA SECTION), ZAMBOANGA CITY

Zamboanga City 2nd DEO, Region IX

2024₱130.9M
Past target date (DPWH On-Going)
No sat.

ROAD UPGRADING (GRAVEL TO PAVED) OF ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), ZAMBOANGA DEL NORTE, 2ND DEO, K 1996 + 500.00 - K 1998 + 270.00, L = 1,770.00 LN.M. K 2002 + 855.00 - K 2003 + 415.00, L = 560.00 LN.M. CHAINAGE 0 - CHAINAGE 940.00

Region IX, Region IX

2017₱129.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE

Region IX, Region IX

2021₱121.5M
Past target date (DPWH On-Going)
View all 55 projects →

4. Implementation

Contract Amount

₱46,204,552.53

Progress

Reported complete (DPWH)

Start Date

May 23, 2017

Target End

January 8, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros Occidental
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.