Flood Control and Drainage18GH0034

CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BRGY. POBLACION ILAWOD, BAROTAC VIEJO, ILOILO

CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BRGY. POBLACION ILAWOD, BAROTAC VIEJO, ILOILO is a DPWH-tracked public work in Iloilo 3rd DEO, Region VI. Reported contract value: ₱50,416,442.89. Status: Reported complete (DPWH). Contractor on record: UNITEC BUILDER INC. Figures trace to dpwh.

Iloilo 3rd DEO, Region VI
Region: Region VI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱15,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROI-18-0007875 · ₱79,883 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18GH0034 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-19 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Iloilo

Based on the coordinates published with the DPWH record and NOAH file Iloilo.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BRGY. POBLACION ILAWOD, BAROTAC VIEJO, ILOILO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Barotac Viejo River Control, Brgy. Natividad, Barotac Viejo, Iloilo
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROI-18-0007875

₱79,883.00 · FY2018

Released to Regional Office - I (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

55 projects · ₱3.5B total · 2 flags

Other projects by this contractor

No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (UPSTREAM - LEFT SIDE

Region IX, Region IX

2025₱145.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF BY- PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD,(WEST COAST SECTION), ZAMBOANGA CITY

Region IX, Region IX

2020₱141.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 4

Region IX, Region IX

2024₱138.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUMAGA SECTION), ZAMBOANGA CITY

Zamboanga City 2nd DEO, Region IX

2024₱130.9M
Past target date (DPWH On-Going)
No sat.

ROAD UPGRADING (GRAVEL TO PAVED) OF ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), ZAMBOANGA DEL NORTE, 2ND DEO, K 1996 + 500.00 - K 1998 + 270.00, L = 1,770.00 LN.M. K 2002 + 855.00 - K 2003 + 415.00, L = 560.00 LN.M. CHAINAGE 0 - CHAINAGE 940.00

Region IX, Region IX

2017₱129.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE

Region IX, Region IX

2021₱121.5M
Past target date (DPWH On-Going)
View all 55 projects →

4. Implementation

Contract Amount

₱50,416,442.89

Progress

Reported complete (DPWH)

Start Date

February 16, 2018

Target End

October 2, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)IloiloBarotac ViejoNueva Sevilla
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.