Construction of Flood Control Structures along Marang River (Section 1), Brgy. Comon, Aritao, Nueva Vizcaya
Construction of Flood Control Structures along Marang River (Section 1), Brgy. Comon, Aritao, Nueva Vizcaya is a DPWH-tracked public work in ARITAO (NUEVA VIZCAYA), NUEVA VIZCAYA, Region II. Reported contract value: ₱29,123,404.28. Status: Reported complete (DPWH). Contractor on record: M R VARGAS CONST CORP FORMERLY: M R VARGAS CONST. Figures trace to sumbong.
Total Contract Cost
