Roads20DE0042

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, LOBO-MALABRIGO-SN JUAN RD - K0163+626 - K0165+099, K0166+474 - K0166+719

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, LOBO-MALABRIGO-SN JUAN RD - K0163+626 - K0165+099, K0166+474 - K0166+719 is a DPWH-tracked public work in Batangas 2nd DEO, Region IV-A. Reported contract value: ₱88,780,000.00. Status: Reported complete (DPWH). Contractor on record: TCSC CORP. Figures trace to dpwh.

Batangas 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱45,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20DE0042 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-13 → 2019-03-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱51,676,368 per km= 1.2x the Region IV-A median (n=330)

Contract cost ₱88,780,000 ÷ 1.718 km read from the DPWH title (“K0163+626 - K0165+099; K0166+474 - K0166+719”; K-post / station range length). National percentile: 85. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, LOBO-MALABRIGO-SN JUAN RD - K0163+626 - K0165+099, K0166+474 - K0166+719

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure Along Sawang River (Sitio Bungahan II and Sitio Ulopong), Lobo, Batangas
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Batangas 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

221 projects · ₱15.7B total · 0 flags

Other projects by this contractor

View all 221 projects →

4. Implementation

Contract Amount

₱88,780,000.00

Progress

Reported complete (DPWH)

Start Date

February 24, 2020

Target End

December 15, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.