CONST. OF REVETMENT AT GAHUB FCD(UPSTREAM)OF GAHUB BRIDGE LEFT SIDE ALONG GAHUB RIVER, MIS OR.
CONST. OF REVETMENT AT GAHUB FCD(UPSTREAM)OF GAHUB BRIDGE LEFT SIDE ALONG GAHUB RIVER, MIS OR. is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱73,370,435.91. Status: Reported complete (DPWH). Contractor on record: LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST. Figures trace to dpwh.
Total Contract Cost
