LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST is listed as a company organization in Philippine public procurement records on this site, with 304 linked DPWH project(s) totaling about ₱17,101,561,949.92. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 304
- Total value
- ₱17,101,561,949.92
- Published flags
- 2
- Region
- Surigao del Sur 2nd DEO · Region XIII
Licensed officers (PCAB)
- Laurence Chua Ting · Authorized Managing Officer (PCAB license 23666) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST — not an accusation or finding of wrongdoing.
Score: 82.80 / 100 · Projects in sample: 304 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 62.9/100 · Weight: 45%
- graceDays
- 30
- componentScore
- 62.9
- lateCompletedProjects
- 35
- onTimeCompletedProjects
- 202
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 293
- pastTargetOngoingProjects
- 56
- undatedCompletedProjectsExcluded
- 11
- Termination rate
Component score: 100/100 · Weight: 20%
- totalProjects
- 304
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 20%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 304
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 10%
- projects
- 304
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 2
- COA audit observations (linked)
Component score: 99.9/100 · Weight: 5%
- projects
- 304
- componentScore
- 99.9
- linkedObservations
- 1
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 278 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF ACCESS ROADS LEADING TO SEAPORTS, TABON - LABISMA ROAD LEADING TO LAWIGAN PORT, BISLIG CITY, SURIGAO DEL SUR18N00020 · ₱241,249,999.38 · mapped
- CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ-DUGMANON-ENCHANTED RIVER-BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY HINATUAN, INCL. BRIDGE (CAMBATONG BR.), HINATUAN, SURIGAO DEL SUR18N00080 · ₱192,999,520.60 · mapped
- ROAD WIDENING, SURIGAO - DAVAO COASTAL ROAD (S00313MN), K1347+000 - K1349+000, K1357+700 - K1358+799, K1358+938 - K1359+000, 1361+000 - K1362+994, MARIHATAG, SURIGAO DEL SUR18N00011 · ₱174,831,275.51 · mapped
- CONSTRUCTION OF BUNAWAN - VERUELA ROAD (PHASE 1), AGUSAN DEL SUR22N00153 · ₱173,699,516.07 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT, SURIGAO-DAVAO COASTAL ROAD, K1296+000-K1297+261, 1297+540-K1302+468, TANDAG CITY - TAGO, SURIGAO DEL SUR18N00057 · ₱172,513,048.23 · mapped
- CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR24N00150 · ₱171,863,847.33 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SILPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO - DAVAO COASTAL ROAD, K1212+940 - K1213+268, SURIGAO DEL SUR17N00017 · ₱153,013,283.64 · mapped
- ROAD UPGRADING OF NRJ - AZPETIA - MABUHAY ROAD (LEADING TO BEGA FALLS), PROSPERIDAD, AGUSAN DEL SUR15N00143 · ₱147,720,014.36
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, TABON - LABISMA ROAD LEADING TO LAWIGAN PORT, BISLIG CITY, SURIGAO DEL SUR 2ND LD17N00071 · ₱144,749,997.14 · mapped
- CONSTRUCTION OF BYPASS/DIVERSION ROADS, TAGONGON -STA. MARIA-STA. JUANA-MAPUTI-DREAMLAND-BINGCONGAN-SAN ROQUE, PACKAGE A, TAGBINA, SURIGAO DEL SUR19N00008 · ₱144,749,973.02 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECT, CONSTRUCTION OF NRJ - SAN TEODORO - POBLACION - NUEVA ERA ROAD, BUNAWAN, AGUSAN DEL SUR18N00033 · ₱144,749,970.02 · mapped
- CONSTRUCTION OF NRJ - SAN TEODORO - POLACION - NUEVA ERA ROAD, AGUSAN DEL SUR 2ND LD., AGUSAN DEL SUR17N00052 · ₱144,749,805.43 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATION- NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING- TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR19N00065 · ₱144,749,651.37 · mapped
- NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR20N00043 · ₱144,748,802.10 · mapped
- CONSTRUCTION OF ODIONGAN BRIDGE 2, GINGOOG CITY, MISAMIS ORIENTAL24KK0051 · ₱143,274,502.41 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BUTUAN CITY - TALACOGON - LORETO - VERUELA - STA. JOSEFA ROAD, K1336+304 - K1340+000, K1314+088 - K1342+770, MARBON, TALACOGON, AGUSAN DEL SUR15N00082 · ₱143,249,960.20 · mapped
- CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR25NI0019 · ₱143,192,841.70 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED), BUTUAN CITY - TALACOGON - LORETO - VERUELA - STA. JOSEFA ROAD, K1370+749 - K1375+648, K1377+-170 - K1377+170, SAGUNTO (LA PAZ) - BRGY. WALOE (LORETO) - BRGY. GUITAS (LORETO), AGUSAN DEL SUR15N00090 · ₱141,748,550.12 · mapped
- CONSTRUCTION OF TAGO - LA PAZ ROAD (SDCR ALTERNATE ROUT), LA PAZ, SURIGAO DEL SUR 1ST LD.15N00099 · ₱133,052,447.93 · mapped
- NRJ-DUGMANON-ENCHANTED RIVER-BACULIN ROAD LEADING TO ENCHANTED RIVER, HINATUAN, SURIGAO DEL SUR23N00154 · ₱131,625,992.30 · mapped
- ROAD WIDENING, SURIGAO - DAVAO COASTAL RD - K1454+445 - K1456+400, K1460+814 - K1462+656, BISLIG CITY, SURIGAO DEL SUR18N00035 · ₱118,580,159.97 · mapped
- ROAD WIDENING, SURIGAO - DAVAO COASTAL ROAD (S00313MN), K1230+745 - K1232+680, K1232+705.80 - K1232+909, K1232+945.20 - K1234+844, CANTILAN, SURIGAO DEL SUR18N00006 · ₱116,866,830.32 · mapped
- Construction of Bank Revetment along Hinatuan River (Sto. Niño Section), Hinatuan, Surigao del Sur24NI0057 · ₱115,796,983.10 · mapped
- CONSTRUCTION OF BYPASS/DIVERSION ROADS, MARIHATAG BYPASS ROAD (SDCR ALTERNATE ROUTE) INCL. ROW, SURIGAO DEL SUR, MARIHATAG, SURIGAO DEL SUR18N00043 · ₱115,399,978.49 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED), BUTUAN CITY - TALACOGON - LORETO - VERUELA - STA. JOSEFA ROAD, K1343+009 - K1343+911, K1349+527 - K1350+480, K1350+640 - K1353+114, MARBON, AGUSAN DEL SUR15N00062 · ₱114,850,619.88 · mapped
- Construction of Bank Revetment along Bislig River (Burboanan Section), Bislig City, Surigao del Sur23N00153 · ₱110,974,996.60 · mapped
- CONSTRUCTION OF ROAD, JUNCTION BANATI-QUARRY 2-MALIPAYON, BARANGAY VILLAVERDE, TAGBINA, SURIGAO DEL SUR22N00084 · ₱110,974,850.93 · mapped
- CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR23N00152 · ₱110,974,850.30 · mapped
- IMPROVEMENT/WIDENING OF NATIONAL ROADS, SURIGAO-DAVAO COASTAL ROAD, K1227+300 - K1228+800, K1235+750 - K1238+080, CARRASCAL, SURIGAO DEL SUR17N00067 · ₱110,971,783.58 · mapped
- Construction of Union Flood Control, Barangay Union, Madrid, Surigao del Sur23N00019 · ₱109,044,970.00 · mapped
- TINAGO - PORT LAMON ROAD LEADING TO SARSOZA CAVE/TINAGO LAGOON, BRGY. PORT LAMON, HINATUAN, SURIGAO DEL SUR22N00040 · ₱106,149,993.97 · mapped
- POBLACION TO MAGSAYSAY TO OSMENA TO VILLAVERDE TO SSF KAHAYAGAN IN SUPPORT TO AGRIBUSINESS INDUSTRY, SITIO MABUHAY, KAHAYAGAN, TAGBINA, SURIGAO DEL SUR22N00043 · ₱106,149,984.67 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ESTUARY OF HUBO RIVER, BARANGAY POBLACION, SAN AGUSTIN, SURIGAO DEL SUR23N00148 · ₱106,148,506.52 · mapped
- TAGONGON- STA. MARIA- STA. JUANA- MAPUTI- DREAMLAND- BINGCONGAN- SAN ROQUE, PACKAGE E, SURIGAO DEL SUR20N00044 · ₱106,145,038.88 · mapped
- POBLACION TO MAGSAYSAY TO OSMEÑA TO VILLAVERDE TO SSF KAHAYAGAN IN SUPPORT TO AGRIBUSINESS INDUSTRY, SITIO MABUHAY, KAHAYAGAN, TAGBINA, SURIGAO DEL SUR21N00065 · ₱102,443,361.58 · mapped
- CANTILAN- MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), SURIGAO DEL SUR, MADRID, SURIGAO DEL SUR21N00010 · ₱101,324,990.60 · mapped
- CANTILAN- MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), MADRID, SURIGAO DEL SUR20N00052 · ₱101,324,985.77 · mapped
- CONSTRUCTION OF MARIHATAG SEAWALL, MARIHATAG, SURIGAO DEL SUR24NH0047 · ₱101,324,885.52 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- MARIHATAG BY-PASS RD (SDCR ALTERNATE ROUTE), MARIHATAG, SURIGAO DEL SUR19N00069 · ₱99,324,995.06 · mapped
- CONSTRUCTION (CONCRETING) OF DUGHAN -KAUSWAGAN-SAN ROQUE - GAMUT ROAD SECTION, BAROBO, SURIGAO DEL SUR23NI0048 · ₱98,999,424.88 · mapped
- NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY HINATUAN, SURIGAO DEL SUR, PACKAGE I21N00011 · ₱98,912,497.20 · mapped
- NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR, PACKAGE II21N00013 · ₱98,903,213.41 · mapped
- NRJ-DUGMANON-ENCHANTED RIVER-BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR, PACKAGE II21N00169 · ₱98,429,383.23 · mapped
- REHABILITATION OF TOTALLY-DAMAGED CONCRETE SPILLWAY TO ODIONGAN BRIDGE 2 AND APPROACHES, GINGOOG CITY, MISAMIS ORIENTAL (PHASE II)23KK0102 · ₱96,500,000.00 · mapped
- TAGONGON-STA. JUANA -MAPUTI-DREAMLAND-BINGCONGAN- SAN ROQUE BYPASS ROAD, SURIGAO DEL SUR24NI0027 · ₱96,499,986.09 · mapped
- NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, HINATUAN, SURIGAO DEL SUR22N00116 · ₱96,499,974.58 · mapped
- CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR24NI0059 · ₱96,499,860.33 · mapped
- Construction of Shoreline Protection of Ten Coastal Barangays, San Agustin, Surigao Del Sur22NH0046 · ₱96,499,747.18 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR24NI0098 · ₱96,499,601.86 · mapped
- ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1422 + 100 - K1424 + 60024NI0042 · ₱96,499,492.39 · mapped
Equipment & capacity
PCAB license
- License no.
- 23666
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Oct 21, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 23666); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
39 evaluations listed across 5 GPPB CPES releases; average final rating 91.5% over 7 rated projects; 39 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 9, 2025 | NIA | ₱37,737,796.00 | Completed | 90.0% | 88.8% | 40th, p. 184 |
| Jun 26, 2025 | DPWH | ₱49,498,336.00 | Completed | 93.3% | 91.5% | 40th, p. 183 |
| Jun 26, 2025 | DPWH | ₱96,498,973.00 | On-going | 90.5% | — | 40th, p. 183 |
| Jun 26, 2025 | DPWH | ₱96,499,860.00 | On-going | 89.3% | — | 40th, p. 183 |
| Jun 24, 2025 | DPWH | ₱96,496,690.00 | Completed | 97.6% | 88.1% | 40th, p. 183 |
| Jun 9, 2025 | DPWH | ₱48,975,848.00 | On-going | 97.9% | — | 40th, p. 183 |
| Jun 9, 2025 | DPWH | ₱57,870,894.00 | On-going | 94.2% | — | 40th, p. 183 |
| Jun 9, 2025 | DPWH | ₱19,516,598.00 | On-going | 92.2% | — | 40th, p. 184 |
| Jun 5, 2025 | DPWH | ₱143,192,848.00 | On-going | 95.5% | — | 40th, p. 184 |
| Jun 3, 2025 | DPWH | ₱81,594,678.00 | On-going | 94.2% | — | 40th, p. 183 |
| Jun 3, 2025 | DPWH | ₱81,060,000.00 | On-going | 96.0% | — | 40th, p. 183 |
| Mar 22, 2025 | DPWH | ₱48,249,311.00 | Completed | 96.3% | 95.6% | 40th, p. 183 |
Showing the 12 most recent of 39.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →