Flood Control and Drainage25FI0043

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY POBLACION, BALUD, M

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY POBLACION, BALUD, M is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱69,443,870.96. Status: Past target date (DPWH On-Going). Contractor on record: A3 CONST & SUPPLY. Figures trace to dpwh.

Masbate 2nd DEO, Region V
Region: Region V

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Barangay Poblacion, Monreal, Masbate
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Masbate 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

24 projects · ₱1.6B total · 1 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0554+068-K0554+598.5,K0554+756-K0555+049.5, PIO DURAN,ALBAY

Region V, Region V

2023₱144.7M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0551+880-K0552+000,K0552+559-K0552+707.5, PIO DURAN,ALBAY

Region V, Region V

2023₱144.7M
Reported complete (DPWH)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY TANAG, LIBMANAN, CAMARINES

Camarines Sur 2nd DEO, Region V

2024₱138.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ROAD WIDENING - SECONDARY ROADSJCT. TAFT - ORAS - SAN POLICARPO - ARTECHE RD (S00167SM), K0965+923 - K0968+000, K0968+537 - K0969+749

Eastern Samar DEO, Region VIII

2025₱119.7M
Ongoing (DPWH-reported)

Construction of Flood Control System along Barangay Sumlang to Barangay Gapo, Camalig, Albay

CAMALIG (ALBAY), ALBAY, Region V

2024₱96.5M
Reported complete (DPWH)

Construction of Flood Mitigation and Drainage Structure along Quirangay River, Camalig, Albay (Package 1)

CAMALIG (ALBAY), ALBAY, Region V

2024₱96.5M
Reported complete (DPWH)
View all 24 projects →

4. Implementation

Contract Amount

₱69,443,870.96

Progress

Past target date (DPWH On-Going)

Start Date

May 28, 2025

Target End

February 21, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.