A3 CONST & SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 24 linked DPWH project(s) totaling about ₱1,644,468,426.27. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
A3 CONST & SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 24
- Total value
- ₱1,644,468,426.27
- Published flags
- 1
- Region
- ALBAY · Region V
Licensed officers (PCAB)
- Lalaine Arienda Balonzo · Authorized Managing Officer (PCAB license 39671) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for A3 CONST & SUPPLY — not an accusation or finding of wrongdoing.
Score: 80.80 / 100 · Projects in sample: 24 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 70/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 70
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 16
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 22
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 24
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 24
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.8/100 · Weight: 11%
- projects
- 24
- componentScore
- 98.8
- flagsPerProject
- 0.04
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
23 geotagged projects — Open full map · Download projects (CSV)
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0554+068-K0554+598.5,K0554+756-K0555+049.5, PIO DURAN,ALBAY23F00064 · ₱144,749,288.24 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0551+880-K0552+000,K0552+559-K0552+707.5, PIO DURAN,ALBAY23F00135 · ₱144,749,121.70 · mapped
- CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY TANAG, LIBMANAN, CAMARINES24FE0023 · ₱138,525,789.38 · mapped
- ROAD WIDENING - SECONDARY ROADSJCT. TAFT - ORAS - SAN POLICARPO - ARTECHE RD (S00167SM), K0965+923 - K0968+000, K0968+537 - K0969+74925IB0107 · ₱119,736,707.49
- Construction of Flood Control System along Barangay Sumlang to Barangay Gapo, Camalig, Albay24FB0060 · ₱96,498,671.05 · mapped
- Construction of Flood Mitigation and Drainage Structure along Quirangay River, Camalig, Albay (Package 1)24FB0017 · ₱96,498,182.44 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - SAN FERNANDO-TALISAY ROAD - K0003+065 - K0003+209.22FM0004 · ₱77,199,983.57 · mapped
- Rehabilitation of Flood Control at Maangot River, Purok 2, Barangay San Isidro, Sto. Domingo, Albay23FA0047 · ₱72,375,000.00 · mapped
- ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY POBLACION, BALUD, M25FI0043 · ₱69,443,870.96 · mapped
- OO1 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0527 + 647 - K0528 +460, K0530 + 000 - K0532 + 00022FB0047 · ₱60,870,897.53 · mapped
- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF FLOOD PROTECTION (DIKE) ALONG BARANGAY PAWA - BOGTONG , LEGAZPI CITY, ALBAY23FB0008 · ₱57,894,328.11 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD - JUNCTION NATIONAL ROAD, SITIO MAPUTAP - SITIO KILAPAD, POBLACION 2, CLAVERIA, MASBATE.23FM0012 · ₱49,491,564.21 · mapped
- CONSTRUCTION/REHABILITATION OF SAN LORENZO-SALVACION-FATIMA-TAGAS-SAN ROQUE-TABACO WHARF ROAD, TABACO CITY, ALBAY24FA0003 · ₱49,000,000.00 · mapped
- Construction of Flood Mitigation Structure, Bito River (Upstream), Barangay Corbada, San Fernando, Masbate24FM0034 · ₱48,999,764.72 · mapped
- Construction of Flood Mitigation Structure along Barangay Pawa, Legazpi City, Albay24FB0047 · ₱48,998,722.69 · mapped
- Construction of Flood Control Concrete Revetment, Segundo River, Barangay Madbad, Cawayan, Masbate24FJ0025 · ₱48,848,417.08 · mapped
- CONCRETING OF SAN VICENTE FMR, BRGY. VICENTE, DARAGA, ALBAY23FB0139 · ₱48,120,152.35 · mapped
- CONSTRUCTION OF BUDIAO ROAD SLOPE PROTECTION STRUCTURE, BRGY. BUDIAO, DARAGA, ALBAY22FB0204 · ₱47,313,551.28 · mapped
- ASSET PRESEVATION PROGRAM, REHAB/RECONST OF ROADS, WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE18FJ0022 · ₱46,464,546.98 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-POBLACION-MOROCBOROCAN GUINHADAP ROAD LEADING TO SAN MIGUEL ISLAND DIVE SITE AND LIGHT HOUSE, AND OTHER TOURISM AREAS.22FM0028 · ₱45,287,758.24 · mapped
- Construction of Talisay Shore Protection/Causeway (Package 4), Brgy. Talisay, San Fernando, Masbate22FM0014 · ₱41,894,584.96 · mapped
- NET. DEVT. PROG., ROAD WIDENING, BUENAVISTA, KAWAYAN ROAD - K0045+390 - K0046+92018FJ0080 · ₱38,705,701.99 · mapped
- Rehabilitation/Improvement of Lanang River Control, Aroroy, Masbate22FI0025 · ₱34,188,561.03 · mapped
- FLOOD MGT. PROGRAM,REHAB./IMPV'T. OF PALANAS FLOOD CONTROL,POBLACION,PALANAS, MASBATE18FJ0053 · ₱18,613,260.27 · mapped
Equipment & capacity
PCAB license
- License no.
- 39671
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 12, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39671); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
23 evaluations listed across 6 GPPB CPES releases; average final rating 93.6% over 12 rated projects; 23 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 22, 2025 | DPWH | ₱93,604,177.00 | On-going | 95.1% | — | 40th, p. 14 |
| May 1, 2025 | DPWH | ₱48,999,765.00 | Completed | 92.1% | 93.2% | 40th, p. 14 |
| Feb 15, 2025 | DPWH (JV) | ₱139,924,789.00 | Completed | 91.9% | 91.9% | 39th (rev), p. 12 |
| Feb 13, 2025 | DPWH (JV) | ₱96,435,398.00 | Completed | 96.0% | 93.1% | 39th (rev), p. 11 |
| Feb 11, 2025 | DPWH (JV) | ₱63,156,272.00 | On-going | 87.2% | — | 39th (rev), p. 11 |
| Dec 9, 2024 | DPWH (JV) | ₱96,499,957.00 | Completed | 93.9% | 94.2% | 39th (rev), p. 11 |
| Dec 2, 2024 | DPWH | ₱50,661,903.00 | Completed | 93.7% | 94.0% | 39th (rev), p. 11 |
| Dec 2, 2024 | DPWH (JV) | ₱48,962,315.00 | Completed | 91.7% | 94.5% | 39th (rev), p. 11 |
| Dec 2, 2024 | DPWH | ₱149,380,804.00 | Completed | 93.5% | 91.9% | 39th (rev), p. 10 |
| Dec 1, 2024 | DPWH (JV) | ₱96,490,836.00 | Completed | 95.6% | 95.8% | 39th (rev), p. 12 |
| Nov 25, 2024 | DPWH | ₱96,498,182.00 | Completed | 90.9% | 94.9% | 39th (rev), p. 10 |
| Oct 17, 2024 | DPWH | ₱48,999,765.00 | On-going | 94.0% | — | 39th (rev), p. 11 |
Showing the 12 most recent of 23.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →